T3.2 Treadmill
04
Customer Support 0800 440 2459
T3.2 Treadmill
05
reebokfitness.info
Uprights
1. Remove the treadmill from the box.
2. Lift the uprights to the unfolded position and secure using 2 x 810 bolts.
3. Insert 2 x 809 bolts into the base of the uprights and cover with 2 x 246 caps.
Handlebars
4. Rotate console until it is in an appropriate position for use.
5. Push one handlebar (208) into the left hand side of the console support frame.
6. Secure the handlebar using 2 x 806 bolts, 2 x 807 spring washers and 2 x 814 washers.
7. Repeat for the right hand handlebar.
Assembly
You will require:
You will require:
810
x 2
807
x 4
806
x 4
246
x 2
809
x 2
814
x 4
208
x 2
RFE4489_RE013411_T3.2 TREADMILL UMFINAL.indd 4-5
28/06/2010 11:41