background image

Phone: 800-666-3691 or 814-452-3691

Fax: 800-456-1697 or 814-455-1697

www..reedmfgco.com

Reed Manufacturing Company

1425 West 8th Street

Erie, PA 16502  USA

5. Turn the pipe stand to an upright position and put the feet on

the lower end of the pipe legs, aligning them so they sit flat on

the floor. Clamp them in this position with the set screws;

the pipe stand is now ready for use.

6. For use on extremely soft or muddy ground, the feet may be

placed on a 5 foot (1.53 m) piece of plank, front and back and nailed

in position through the nail holes provided in the sockets.

NOTE: Not recommended for greater torque, just stability for

soft ground.

Transporting  the  FPV20

When the pipe stand has to be knocked down and transported,

merely loosen the knobs (or bolts) and clamp the legs in the frames. 

Remove the four legs and place them in the "V"s, securing them to

the rest of the stand with the chain pipe clamp. The entire assem-

bly can now be carried as one compact bundle. Fig. 2.

Instructions for Assembling Field Pipe Vise

Fig. 2

Capacity 2" - 20" (50 - 500 mm)

1114-50312

Reviews: