Phone: 800-666-3691 or 814-452-3691
Fax: 800-456-1697 or 814-455-1697
www..reedmfgco.com
Reed Manufacturing Company
1425 West 8th Street
Erie, PA 16502 USA
5. Turn the pipe stand to an upright position and put the feet on
the lower end of the pipe legs, aligning them so they sit flat on
the floor. Clamp them in this position with the set screws;
the pipe stand is now ready for use.
6. For use on extremely soft or muddy ground, the feet may be
placed on a 5 foot (1.53 m) piece of plank, front and back and nailed
in position through the nail holes provided in the sockets.
NOTE: Not recommended for greater torque, just stability for
soft ground.
Transporting the FPV20
When the pipe stand has to be knocked down and transported,
merely loosen the knobs (or bolts) and clamp the legs in the frames.
Remove the four legs and place them in the "V"s, securing them to
the rest of the stand with the chain pipe clamp. The entire assem-
bly can now be carried as one compact bundle. Fig. 2.
Instructions for Assembling Field Pipe Vise
Fig. 2
Capacity 2" - 20" (50 - 500 mm)
1114-50312