background image

System inställningar/
System-dependent setting

p

SV

[bar] =

Säkerhets upphämtning av trycket i värme generatorn/ 

Safety pick-up pressure at the heat generator

 

p

max

[bar] =

0.3 bar

 0.5 bar

p

e

[bar] =

Slutnings tryck av expansionkärl/ 

Final pressure of the expansion vessel

p

a

=

vatten tillförsel när trycket understiger det önskade värdet/ 

Water make-up when

 

pressure remains under below the required value

p

a

[bar] =

Fyllnings tryck p

av expansionskärlet/ 

Starting or filling pressure p

F

 of the expansion vessel

p

0

[bar] = p

statisk/

static

 + p

Avdunstning/

evaporation

 + 0.2 bar 

(rekomenderas/

recommended

 0.3 bar

p

st

[bar] =

Statiskt tryck (statisk höjd [m] / 10)/ 
static pressure (static height [m] / 10)

0...0.2 bar

Exempel:
Värmesystemet,  
statisk höjd 10 m  
(p

st

 = 1.0 bar),

p

0

 = 1.0 bar + 0 bar + 0.2 bar  

(rekomenderas)

 

p

0

 = 1.2 bar 

 Vid igång körning

Example:
Heating system,  
static height 10 m  
(p

st

 = 1.0 bar), 

p

0

 = 1.0 bar + 0 bar + 0.2 bar  

(recommended)

 

p

0

 = 1.2 bar 

 On-site setting

 

påfyllningsstation PÅ 
= p

0

 + 0.1 bar = 1.3 bar

påfyllningsstation AV

 

= p

0

 + 0.3 bar = 1.5 bar

Förutsättningar för igångkörning/
Prerequisites for initial start-up

•  Installationen av Reflex påfyllningsstation är nu klar.
• Inkopplingen på vattensidan av systemet inkl. uppströms och nedströms avstängningsventiler
  sitter på plats.
• Elkopplingen enligt bestämmelserna VDE och EVU har blivit utförda.
• Rörledningarna till Reflex påfyllningsstation måste sköljas och rensas från smuts och svetsrester.
• Kopplingen av avtappningen till avloppet ska följa bestämmelserna enligt DIN EN 12056
• Manometern har blivit installerad på reduceringsventilen. (fabriks monterad från approx 06/06)

• Installation reflex ’fillcontrol’ is completed.
• The connection on the water side of the system and to the refill water incl. upstream and downstream shut-off   
   valves on-site is made.
• The electrical connection acc. to the valid VDE and the local EVU regulations has been established.
• The pipelines towards reflex ’fillcontrol’ have to be rinsed and to be cleaned from dirt and welding residue.
• The connection of the tundish to the sewage has to be made acc. to the valid norm DIN EN 12056.
• The enclosed manometer has been installed at the pressure reducer (from approx. 06/06 factory-mounted).

S

GB

S

Förberedelser igångkörning/ 
Steps to intial start-up

Vattenkoppling

Öppna alla avstängningsventiler för att ställa in kontroll parametrarna. 

Parametrarna skall vara inställda efter kundens behov

Kontroll enheten inkluderar tre nivåer, och lösenord för att skydda service menyn 

 (→ S. 11), 

Meny för fyllning av systemet

 (→ S.10), 

och kundens inställda meny. Igångkörningen kan kräva vissa

 justeringar av de fabriksinställda värdena beroende på vilket system den installeras i.

Establish water connection
Open all upstream and downstream shut-off valves prior to setting the control parameters. 
System-dependent parameter setting of the customer menu
The control unit includes three control levels, the password protected service menu (

 p. 11),  the menu for the 

initial filling of the system (

 p.10), and the customer menu.

The initial start-up possibly requires the adjustment of some factory settings to the respective system-specific con-
ditions.

GB

reflex ’påfyllningsstation’ 
Förberedelse igångkörning/
Initial start-up

Summary of Contents for fillcontrol

Page 1: ...reflex fillcontrol reflex p fyllningsstation Water make up device Installation Drift och sk tselanvisningar Installation operation and maintenance instructions Stand Status 04 06...

Page 2: ...lectrical connection 7 Terminal connection diagram 7 Initial start up Prerequisites for initial start up 8 Steps of initial start up 8 System dependent setting 8 9 Pressure reducer setting 9 10 Parame...

Page 3: ...us Access menus Quit error messages Upp ner val knappar Up Down operation selection buttons 1 Avst ngning Shut off 2 Tryck givare Pressure sensor 3 Kontroll panel Control Control panel 4 Motor kulvent...

Page 4: ...cal data are provided on the type plate or the markings on the valve Make sure to fully comply with the service parameters of tempera ture and pressure protection do not remain under these values and...

Page 5: ...off system separator type BA acc to DIN EN 1717 tundish dirt trap mano meter connections motor operated ball valve control unit pressure sensor manometer and pressure reducer acc to DIN EN 1567 Adjus...

Page 6: ...the connecting pipe of the reflex fillcontrol make sure that stagnation is excluded The down stream pipe has to be passed in a way length nominal width that the the loss of pressure in this pipe is 0...

Page 7: ...power supply Kopplings schema Terminal connection diagram Givare Transducer Tryckgivare 3 pols anslutning PH Str mf rs rjd tryckgivare Jord tryckgivare Signal tryckgivare fr nh gertillv nster Pressure...

Page 8: ...ometern har blivit installerad p reduceringsventilen fabriks monterad fr n approx 06 06 Installation reflex fillcontrol is completed The connection on the water side of the system and to the refill wa...

Page 9: ...e knappen igen i 4 sekunder s kommer lysdiod I Tryck blinka var 0 5 sekund Det inst llda trycket visas nu i displayen f r att st lla in r tt v rde p0 s f r man justera det genom att trycka p ner eller...

Page 10: ...fyllningstiden verstiger tv timmar tror systemet att det finns ett l ckage och ett felmeddelande kommer fram i displayen S 12 Under systemets fyllningstid skall trycket kvarst S 8 Drift vervakningen...

Page 11: ...low the setting value if the second value is exeeded reflex fillcontrol is turned off p 8 During the LED Auto is green and at the same time the LED IV is red The operation time and the number of cycle...

Page 12: ...ppen i 3 sek E3 Auto blinkar r tt Osannolikt tryck signal och eller motorn terg r inte till noll l ge och eller internt systemfel ROM och eller internt systemfel EE Flera Olika Informera Reflex servic...

Page 13: ...nande vatten Kolla s att O ringen och t tningarna r intakta reng r eller byt ut om det r n dv ndigt Underh ll reduceringsventil Reduceringsventilen m ste testas med j mna mellanrum minst en g ng per r...

Page 14: ...rating conditions but after one year at the latest The connections available for ball valves allow a functionality test of the device to be carried out with an adequate pressure gauge Dirt trap Isolat...

Page 15: ...r Inspection report no ECL SAF TR 05 071 V01 00 Pr finstitut Labor Inspection body inspection institiute Herberg Service Plus GmbH N rnberg EMV Richtlinie EMV directive EN 55014 1 und 55014 2 Category...

Page 16: ...ical modifications Reflex Winkelmann GmbH Co KG Gersteinstrasse 19 59227 Ahlen Germany Telefon 49 23 82 70 69 0 Telefax 49 23 82 70 69 588 www reflex de Somatherm AB Bang rdsgatan 1 Box 900 671 29 ARV...

Reviews: