Commissioning
Storatherm Heat — 23.02.2021
English — 19
5.3
Tank assembly
5.3.1
Installation
Remove the outer packaging and undo the screws with which the tank is screwed to the pallet.
Position the tank.
WARNING
Risk of injury due to tipping over of the device
Risk of bruising or crushing caused by tipping over of the device
•
Ensure sufficient stability of the device.
5.3.2
Heating system connection
ATTENTION
Device damage from overheating
Incorrect positioning of the safety valve will cause damage to the pipe connections.
•
Fit the safety valve between tank and non
-
return valve.
•
Do not close the safety valve vent.
6
Commissioning
The responsible installer must explain to the operator how the tank functions and how it is to be used.
He/She must draw
attention to maintenance work that has to be carried out at regular intervals. The
service life and correct functioning of the tank are dependent on this. The tank must be emptied if
there is a risk of frost, or prior to its being removed from service.
6.1
Filling the tank
Proceed as follows when filling the tank:
1.
Connection to the heating system.
2.
Filling of the tank and system.
3.
Venting of the tank and system.
4.
Checking of the leak
-tightness.
Summary of Contents for Storatherm H 1000/R2
Page 12: ...Anhang 12 Deutsch Storatherm Heat 23 02 2021 Contents ...
Page 22: ...Appendix 22 English Storatherm Heat 23 02 2021 ...
Page 32: ...Annexe 32 Français Storatherm Heat 23 02 2021 ...
Page 42: ...Załącznik 42 Polski Storatherm Heat 23 02 2021 ...
Page 52: ...Tillegg 52 Norsk Storatherm Heat 23 02 2021 ...
Page 62: ...Bilaga 62 Svenska Storatherm Heat 23 02 2021 ...