UM-0203
Rev 1.1
25 | P a g e
v.
Details of all repairs or modifications carried out should be recorded and copies of
damage and repair / modifications reports should be sent to the party controlling the
use of the carrier.
vi.
Lifting assembly covers should be removed if the wire rope lifting assembly is
removed from service.
vii.
Contact RML or one of our approved partners for technical advice on inspection,
testing or maintenance. It is always helpful to provide detailed photos and reports
along with any query to
4.5
Supporting Documentation
Customer drawing pack
All FROG-XT6-P units are accompanied by a drawing pack that contains all of the relevant
drawings to aid in its maintenance. This pack contains the following:
i.
Assembly Drawings
ii.
Replacement parts, kit drawings
iii.
Torque settings
iv.
Operational stickers
v.
Bill of materials
Certification pack
Every FROG-XT6-P comes complete with a certification package, which includes, but not
limited to
, manufacturer’s declaration of conformity,
all of the critical parts certificates, load
test certificates and the 3rd party release note and checklist.
If any further certification is required, please contact RML.
Component certification
RML retains copies of the certification for all units and components involved in their
manufacture. Replacement copies are available on request.