104
|
City Series CB60EPV
installation
920-178a
01.13.20
6. Place Log 1 on top of the log guide. The log guide will act as a guide
for the proper positioning of Log 1.
7. Install Log 2 to the left of Log 1. Make sure they are connected.
8. Install Log 3 to the right of Log 1. Rest the left side of Log 3 on the log
guide. Connect Log 1 and Log 3 to make the split between less visible.
9. Insert the pin of Log 4 into the hole on the left-most side of the burner.
The right end of Log 4 should sit 1-1/4" from the edge of the panel,
as shown below.
11. Insert the pin of Log 6 into the hole on the right side of the pilot. Posi-
tion the left end of Log 6 3/4" from the edge of the panel.
12. Insert the pin of Log 7 into the hole on the right-most side of the
burner. Position the left end of Log 7 1-5/8" from edge of panel, as
shown below.
3
2
1
10. Insert the pin of Log 5 into the hole on the left side of the pilot. Position
the left end of Log 5 1-3/8" from the edge of the panel.
5
1 3/8"
13. Install one box (3.5 lbs) of 3/4" black coal (optional) around the logs
installed on the panels, as shown below.
Correct Black Coal placement
Do not completely cover secondary air inlets-leave them 50% open.
1 1/4"
4
3/4"
6
7
1 5/8"
2
CITY SERIES 60
Summary of Contents for 686-927
Page 124: ...124 City Series CB60EPV notes ...
Page 125: ...City Series CB60EPV 125 notes ...
Page 126: ...126 City Series CB60EPV notes ...
Page 127: ......