City Series CV72EPV
|
29
installation
Top rear standoffs
Unit Assembly Prior to Installation
Before You Start Removing the Unit from the Pallet
Side Standoff Assembly
The CV72EPV has 4 standoffs, 2 on each side that need assembly before
installing.
The standoffs are shipped in a flat position -- fold the standoff and install the
standoff onto the unit by sliding the 2 tabs into the slots on the unit. Bend the
tabs to secure. Secure opposite end of the standoff with one screw.
Rear Standoffs
The 8 rear standoffs are already attached to the appliance. Do not remove
these standoffs. The 2 top rear standoffs are designed so that screws can be
used to secure the appliance to the rear wall if needed. Studs must be in this
location if choosing to screw this into studs.
Leveling legs
Leveling Legs
There are four levelling legs - two on each side that can be adjusted (with the
supplied tool--found in the manual package) if required.
tooltip
Remove the screws securing the unit to the pallet
Due to the size and weight (529 pounds shipping weight) of the CV72EPV-
-lifting and moving the unit will require 4 people.
Place a length (long enough to get a solid grip on each side) of 2 x 4 under
the handle on each side.
Lift and move the unit carefully.
Note
: When in position, the handles may be removed from the unit by removing
6 screws on each handle. Ensure that when the handles are removed that the
screws are put back into place in all 12 holes locations where the handle had
been previously (6 per side). The handles can be recycled.
standoffs
tooltip
Summary of Contents for City CV72E Series
Page 113: ...City Series CV72EPV 113 notes ...
Page 118: ...118 City Series CV72EPV warranty ...
Page 119: ......