LRI3E-1 / HRI3E-1 Direct Vent Gas Insert
|
19
|
19
installation
919-827
01.25.18
1
LRI3E / HRI3E
CONVERSION FROM NG TO LP
LRI3E/HRI3E
This conversion should be done before the unit is initially installed:
If installed already, the draft hood assembly will need to be removed
so appliance may be slid out from the fi replace opening for ease of
conversion. See manual for details
Before you begin:
Shut off the gas supply to the unit.
Disconnect all electrical supply to the unit.
Always let the appliance cool to room temperature before servicing.
1. Remove faceplate, glass door , inner panels, glass crystals, media, logs
(if already installed)—see instructions in the manual.
2. Slide unit out and remove 3 front screws and loosen 2 back screws to
remove the left side control cover.
3. Disconnect the cable coming from the pressure regulator motor.
WARNING
This conversion kit shall be installed by a qualifi ed service agency in ac-
cordance with the manufacturer’s instructions and all applicable codes and
requirements of the authority having jurisdiction. If these instructions is not
followed exactly, a fi re, explosion or production of carbon monoxide may
result causing property damage, personal injury or loss of life. The quali-
fi ed service agency is responsible for the proper installation of this kit. The
installation is not proper and complete until the operation of the converted
appliance is checked as specifi ed in the manufacturer’s instructions sup-
plied with the kit.
THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER
IF IN DOUBT DO NOT DO THIS CONVERSION!
LRI3E
Conversion Kit includes:
1
904-575
Burner Orifi ce #55
1
910-101
Pilot Orifi ce #35
1
908-590
Decal - Conversion to LP
1
911-011
Stepper Motor - LP
1
904-529
5/32" long Allen Key
1
908-528
Label Propane Red
6. Reattach the pressure regulator wire.
7. LRI3E- Remove the burner by removing 2 screws in locations shown below.
HRI3E- See next page.
Side control cover
5HPRYH
/RRVHQ
4.
Remove and discard 2 Pressure regulator screws A (T20 or slot), Pres-
sure Regulator B, Spring and Diaphragm C.
5. Ensure the rubber gasket, which is prefi tted as part of the Assembly,
is properly positioned. Install the new Pressure Regulator using the 2x
M4 x .7 screws supplied. Tighten the screws to 25lb-in. In the event that
the screw threads are cross threaded or stripped, replace the valve as-
sembly.
Install the enclosed propane identifi cation label to the valve body where it
can be easily seen.
CONVERSION FROM NG TO LP
LRI3E/HRI3E USING PROFLAME 885 VALVE
All manuals and user guides at all-guides.com