16
Regency Bellavista™ B41XTCE Gas Fireplace
INSTALLATION
UNIT ASSEMBLY PRIOR TO INSTALLATION
BEFORE YOU START
The Top Nailing Support, the Side Nailing Strips, the 2 Top Standoffs and the Flue Collar must be correctly positioned and attached before the fi replace
is moved into position.
Nailing strip for
Tile Finish (set
back 1/2")
Nailing strip for
Clean Finish (set
fl ush with unit)
1.
There are 8 (eight) side nailing strips and one top nailing strip available on the unit. One set of four (4) are for a clean fi nish installation, the other
set are for a tile fi nish installation as they are set back 1/2" (13mm). The top nailing strip is adjustable to 1/2" (13mm).
2.
Bend the required four (4) nailing strips to 90º.
3.
Attach top nailing strip with one (1) screw (located at the back of the nailing strip). Adjust to required position, flush or back 1/2" and tighten screw.
Nailing strip for
Tile Finish (set
back 1/2")
Nailing strip for
Clean Finish (set
fl ush with unit)
Adjustable Top
Nailing Strip
NAILING STRIPS
TOP STANDOFF ASSEMBLY
The top standoffs are shipped in a fl at position and must be folded into shape and attached.
1) Remove the standoffs from the fi replace top.
2) Take each standoff and bend into the correct shape. Bend up at the bend lines until
the screw holes in the standoff and the pre-punched screw holes on the fi replace
top line up.
3) Attach the standoff securely to the top with 2 screws per standoff (on opposite
corners).