12
|
Regency
®
E18 Gas Fireplace Insert
|
12
installation
ZERO CLEARANCE FRAMING
VENTING CONFIGURATIONS
The E18 is approved to be attached to any of the approved appliances listed
in the Installation Checklist. The existing unit must be connected to B-Vent
Pipe having at least 8 feet of vertical venting and can have a maximum of 6
feet horizontal venting with two 90 degree elbows. The venting must terminate
vertically with an approved B-Vent Cap.
When Installing the E18 as a Zero Clearance Unit, the E18 will connect to
4" B-Vent only. You must use a minimum of 8 feet of vertical pipe and you
may use up to a maximum of 6 feet of horizontal pipe with two 9 degree
elbows. The venting must terminate vertically with an approved B-Vent Cap.
All horizontal runs must maintain a 1/4" of rise for every foot of horizontal run.
1.
When installing the E18 as a
zero clearance, you will use
the framing clearances in the
following diagrams. Mantel
and inside corner clearances
can be found in Minimum
Clearances to Combustibles.
2.
Attach the E18 to the Zero
Clearance Kit.
3.
Attach the Zero Clearance Kit
to the Framing.
4.
Install the Surround as per
manual.
Diagram 4.1
Diagram 4.2