62
|
Regency
®
E18 Gas Fireplace Insert
|
62
maintenance
1.
Shut off the gas and electrical supply.
2.
Remove Faceplate Control Cover (see instructions in manual).
3.
Remove Glass Door (see instructions in manual).
4.
Remove Log Set and Embers or crystals and stones (if installed).
5.
Remove Burner and Panels (see instructions in this manual).
6.
Unplug the TH and TN/TP wires on the front of the Valve.
VALVE REPLACEMENT
INSTALLING VALVE
7.
Disconnect piezo wire from piezo ignitor.
8.
Unscrew the 8 screws holding down the Valve Tray.
9.
Slide the Valve Tray out about half way giving easier access to the gas
connection at the valve.
1.
Place new valve tray and gasket into position.
2.
Reverse Steps 10-1.
3.
Check for gas leaks.
10.
Disconect the gas line and remove the valve tray.
Diagram 17.1
Diagram 17.2
Diagram 17.3
Summary of Contents for E18-LP
Page 1: ......
Page 74: ...Regency E18 Gas Fireplace Insert 73 73 notes ...
Page 75: ...74 Regency E18 Gas Fireplace Insert 74 notes ...