20 |
F1104S / F3104L Freestanding Woodstove
20 |
installation
OPTIONAL
ACCESSORIES
The pieces listed below can be purchased and
installed during the initial installation or added
on later.
Freestanding - Large F3104
DOOR HANDLE
Attach spring handle by rotating counter
clockwise onto rod. Ensure that the rod fits
into the entire length of the spring handle. See
Diagram below.
GLASS INSTALLATION
Your Regency stove is supplied with 5 mm
Neoceram ceramic glass that will withstand
the highest heat that your unit will produce. In
the event that you break your glass by impact,
purchase your replacement from an authorized
Regency dealer only.
Remove the door from the stove and remove
the glass retainer. Position the glass in the door,
make sure that the glass gasketing will properly
seal your unit, and replace the retainer, it should
rest on the gasket not the glass. Tighten securely,
but do not wrench down on the glass as this may
cause the glass to break.
Refer to the Ash Drawer Operating section.
Bottom Shield Ash Drawer Kit
(850-101 )
1)
Remove the bricks from the floor of the
firebox.
2)
Remove and discard the cover plate by
removing the two screws on the front of the
Bottom Shield.
3)
Remove the ash dump cover plates (one
inside the firebox and one on the underside
of the firebox) by removing the two nuts
and bolts holding the 2 plates together from
inside the firebox.
4)
Push the ash plug into the hole inside the
firebox and replace all the bricks except
for the brick over the ash plug. See brick
diagrams.
5)
Place the ash plug tool beside the lid, then
slide the ash drawer inside.
Refer to the Ash Drawer Operating section.
Freestanding - Small F1104
Pedestal Ash Drawer Kit (850-100)
1)
Remove the bricks from the floor of the
firebox.
2)
If using ashdrawer, discard cover plate.
3)
Remove the ash dump cover plates (one
inside the firebox and one on the underside
of the firebox) by removing the two nuts
and bolts holding the 2 plates together from
inside the firebox.
4)
Push the ash plug into the hole inside the
firebox and replace all the bricks except
for the brick over the ash plug. See brick
diagrams.
5)
Place the ash drawer lid inside the pedestal,
and the ash plug tool beside the lid, then
slide the ash drawer inside so it sits on top
of the lid.
BRICK INSTALLATION
Firebrick is included to extend the life of your
stove and radiate heat more evenly. Check to see
that all firebricks are in their correct positions and
have not become misaligned during shipping.
The "AD" brick in the drawings above is the
brick covering the Ash Dump hole that is used
when the Ash Drawer Kit is installed (refer to
the Listed Components for Mobile Home Instal-
lation section).
SCREEN DOOR
Hook screen to the inside on the right side
of the firebox door opening. Lock in place by
turning handle.
Back Side of Screen Shown
Handle Lock
Hooks
NOTE:
The handle must be positioned at 10
o'clock when closed to avoid the handle from
getting hot and to ensure the screen stays in
place.
Handle at 10 o'clock position.