14
Regency Horizon™ HZ42STE Gas Fireplace
INSTALLATION
FRAMING DIMENSIONS
HZ42STE Framing Dimensions
A *
Framing Depth *
15" (381mm)
**minus 2X the fi nished material thickness
B
Framing Height
36-3/4" (933mm)
C
Framing Width
50" (1270mm) Horizontal or Vertical Vent
D
Gas Connection Height
4-1/2" (114mm)
E
Gas Connection Inset
2-7/8" (73mm)
F
Gas Connection Opening Width
4-5/8" (117mm)
G
Gas Connection Opening Height
2" (51mm)
H
Minimum Height to Combustibles
40-1/2" (1029mm)
* Framing depth measurement is noted with nailing strips (top & sides) set as far forward on the fi rebox
as possible. The nailing strips can be adjusted back up to 1" (on both sides) to allow for varying
thicknesses in non-combustible material and wall fi nishes.
**Finished material thickness includes: non combustible material, tile slate, etc.
(example framing = 13" - if 1" thick fi nishing material is used on both sides)
B
C
All studs
are metal
(on edge)
A
Finished
Floor
H
1/2”
1/2”
Note: All studs on top and sides of unit must be on edge.
Note: Gas hookup is on vent side of unit.
IMPORTANT:
1/2" gap required between
faceplate and fi nished wall.
Dangerous operating
conditions will occur if this is
not adhered to.