**52 5/16"
(1329mm)
to Header
A
A
90" (2286mm)
to Internal
Ceiling
60" (1524mm)
Chase Minimum Width
44 3/4"
(1137mm)
Minimum
26 1/2" (610mm)
Chase Minimum
Depth
** Minimum Height from
the base of the unit.
Figure 12: Installation Clearances with Heat Distribution Kit.
HZ965/L965 Gas Fireplace |
29
29
|
installation
Summary of Contents for Horizon HZ965E
Page 52: ...SAFETY SCREEN INSTALLATION 52 HZ965 L965 Gas Fireplace 52 installation ...
Page 66: ...66 HZ965 L965 Gas Fireplace 66 parts list ...
Page 72: ......
Page 73: ...HZ965 L965 Gas Fireplace 73 73 notes ...
Page 74: ...74 HZ965 L965 Gas Fireplace 74 notes ...
Page 75: ......