Figure 8: Install the power vent.
Figure 9: Securing cord with the Strain Relief.
7. Assemble the outer thimble to the inner thimble and secure the outer thimble to the wall board with screws.
8. Remove power vent case cover from power vent assembly by removing 4 x 5/16” screws (2 per side). Pull the top of power vent and then push downward
on power vent case cover to clear exhaust assembly
9. Insert the power vent electrical cord through the Strain Relief on the bottom right of the power vent assembly, refer to Figure 8.
10. Align the power vent assembly with the direct vent pipe that is protruding through the thimble.
11. Secure the power vent assembly in place with screws as seen in Figure 8.
Inner Thimble
Power Vent
Electrical Cord
Bushing
Screw
Wall Board
Figure 6: Install the inner thimble and the power
vent cords.
Outer Thimble
Bushing
Vents
Screw
Inner Thimble
Wall Board
Power Vent
Electrical Cord
Figure 7: Install the outer thimble.
32
| HZ965/L965 Gas Fireplace
|
32
installation
Summary of Contents for Horizon HZ965E
Page 52: ...SAFETY SCREEN INSTALLATION 52 HZ965 L965 Gas Fireplace 52 installation ...
Page 66: ...66 HZ965 L965 Gas Fireplace 66 parts list ...
Page 72: ......
Page 73: ...HZ965 L965 Gas Fireplace 73 73 notes ...
Page 74: ...74 HZ965 L965 Gas Fireplace 74 notes ...
Page 75: ......