Power Vent
Case Cover
Power Vent
Screw
Vacuum Switch
Power Vent
Assembly
Exhaust
Cut-Out
Figure 11: Install the power vent cover case.
Figure 10: Fan and vacuum switch wired.
Figure 13
:
Remove Right Side Handle & Outside Access Door
Figure 14a
:
FCM COM wire
Figure 14b
:
FCM Disconnected
12. Secure the cord to the Power Vent Assembly with the Strain Relief as shown in Figure 9.
13. Connect the wires to the fan, vacuum switch, and ground according to the wiring diagram in Figure 17. Secure the green ground wire as shown in Figure
9. Route the wires as shown in Figure 10 to prevent them from getting pinched.
14. Align the exhaust deflector with the exhaust cut out on the bottom of the power vent cover and install, refer to Figure 8, 11 and 12. Ensure that the rubber
vacuum hose does not kink when installed.
15 Secure the cover to the power vent assembly with screws to the left and right sides of the assembly.
16. From the outside of the unit - remove the right side handle (6 screws) and access cover (10 screws) shown in Figure 13.
Access Door
Right side Handle
17. Carefully lean the cover plate down and disconnect the FCM Com wire harness from Fan Control Module (FCM) so the wires don’t get damaged shown
in Fig 14a & 14b
FCM wire
FCM disconnected
HZ965/L965 Gas Fireplace |
33
33
|
installation
Summary of Contents for Horizon HZ965E
Page 52: ...SAFETY SCREEN INSTALLATION 52 HZ965 L965 Gas Fireplace 52 installation ...
Page 66: ...66 HZ965 L965 Gas Fireplace 66 parts list ...
Page 72: ......
Page 73: ...HZ965 L965 Gas Fireplace 73 73 notes ...
Page 74: ...74 HZ965 L965 Gas Fireplace 74 notes ...
Page 75: ......