Regency
®
P33-10 Zero Clearance Direct Vent Gas Fireplace
|
9
|
9
installation
DUCT SYSTEM OPTION
Kit #946-556
The
HeatWave
Air Duct Kit increases the
effectiveness of your fireplace by dispersing warm
air from the fireplace to remote locations in the
same room or other rooms in your home.
Up to two kits may be installed on the fireplace.
Please Note:
Only 1 HeatWave kit may be oper
-
ated at one time. This includes the internal blower
option as well.
INSTALLATION
CHECKLIST
1)
Locate appliance
a) Room location
(Refer to "Locating Your Fireplace"
Section)
b) Clearances to Combustibles
(Refer to "Clearances" Section)
c) Mantle Clearances
(Refer to "Combustible Mantels"
Section)
d) Framing & Finishing Requirements
(Refer to "Framing & Finishing"
Section)
e) Venting Requirements
(Refer to "Venting" Sections)
2)
Assemble Top Facing Support and Side
Nailing Strips (Refer to "Unit Assembly Prior
to Installation" Section). NOTE: Must be
done before installing unit into fireplace.
3)
Install vent (Refer to "Venting" Sections).
4)
Install 4-AA batteries into receiver. This will
enable operation of appliance manually
when in "ON" position.
5)
Make gas and electrical connections. Test
the pilot. Must be as per diagram.
(Refer to "Gas Line Installation" and "Pilot
Adjustment" Section).
Convert to Propane if desired.
(Refer to "Conversion Kit from NG to LP"
Section).
6)
Install standard and optional features. Refer
to the following sections:
a. Optional Brick Panels
b. Log Set Installation
c. Standard Glass Door
d. Vignette Faceplate
e. Optional Wall Thermostat
f. Installing the Optional Fan
7)
Final check.
Before leaving this unit with the customer,
the installer must ensure that the appliance is
firing correctly and
operation fully explained
to customer
.
This includes:
1)
Clocking the appliance to ensure the correct
firing rate (rate noted on label) after burning
appliance for 15 minutes.
2)
If required, adjusting the primary air to ensure
that the flame does not carbon. First allow
the unit to burn for 15-20 min. to stabilize.
CAUTION: Any alteration to the product that
causes sooting or carboning that results
in damage is not the responsibility of the
manufacturer.
Diagram 1
LOCATING YOUR
FIREPLACE
1)
When selecting a location for your fireplace,
ensure that the clearances outlined on this
page are met.
2)
Provide adequate clearances for
servicing.
3)
The appliance must be installed on a flat,
solid, continuous surface (e.g. wood, metal,
concrete). This may be the floor, or raised up
on a platform to enhance its visual impact.
If the appliance is going to be installed
on carpeting, combustible linoleum tile or
other combustible material other than wood
flooring, the appliance must be installed on a
metal or wood panel extending the full width
and depth of the appliance.
4)
The P33-10 can be installed in a recessed
position or framed out into the room as in
A, B, C, D. See Diagram 1 below.
5)
This appliance is Listed for bedroom
installations when used with a Listed Millivolt
Thermostat. Some areas may have further
requirements, check local codes before
installation.
6)
The P33-10 Direct Vent Gas Fireplace is
approved for alcove installations, which meet
the clearances listed on the "Clearances"
Section.
7)
We recommend that you plan your installation
on paper using exact measurements for
clearances and floor protection before
actually installing this appliance. Have a
qualified inspector, dealer, or installer review
your plans before installation.
Note: For vent terminations see "Exterior Vent
Termination Locations" Section.
A)
Flat on Wall
B)
Flat on Wall Corner
C)
Recessed into Wall/Alcove
D)
Corner
MANUFACTURED
MOBILE HOME
ADDITIONAL
REQUIREMENTS
1)
Ensure that structural members are not cut or
weakened during installation.
2)
Ensure proper grounding using the #8 ground
lug provided. Refer to "Wiring Diagram" Section.