background image

6. 

Attach the DIN rail with terminal blocks to the back plate of the RegulusBOX, mark the screw  

 

holes. Position the DIN rail as shown.

 

If RegulusBOX already contains pre-drilled holes, just screw the DIN rail with terminal blocks 

 

 

using M4 screws. Proceed to point 8.

7. 

Drill  the  holes  and  screw  on  the  DIN  rail  with  the  terminal  blocks  using  self-tapping  screws 

 

 

(watch out for metal sawdust).

8. 

Insert the relay module into the control board. The module is inserted in the place next to the 

 

 

display. Make sure that all pins are correctly inserted into the control board. Then secure the 

 

 

module with the screws. If you have inserted the module correctly, the screws will fit exactly 

 

 

into the holes.

 

9.

 

Remove the grey cable duct cover. There are such hooks that can be released by pushing in 

 

 

and prying out the plastic cover. The plastic can then be slid out all the way. 

Reviews: