The below listed procedures are valid when a Regulus 
pump station is used.

10.1 Filling

• in order to 

fi

 ll the system, use a 

fi

 lling device with a 

reservoir for solar liquid and a 

fi

 lling pump (see Fig. 30)

• attach the 

fi

 lling hose to the feed valve and open the 

valve completely

• please use antifreeze solar 

fl

 uid Regulus - Solarten 

super to 

fi

 ll the system

• attach the return hose to the bleed valve and open the 

valve completely

• close the integrated ball valve in the 

fl

 owmeter (the 

groove in the 

fl

 owmeter‘s adjusting screw must be 

horizontal).

• open the check valve (valves - two for a twin-pipe 

solar pump station) above the pump by turning the ball 
valve by 45° (intermediate position between open and 
closed)

• pour suf

fi

 cient quantity of solar 

fl

 uid into the reservoir 

of the 

fi

 lling device, turn on the 

fi

 lling pump and 

fi

 ll the 

solar system.

10.2 Flushing

• 

fl

 ush the solar system for at least 15 minutes using 
the 

fi

 lling device. In order to bleed air and possible 

impurities from the system perfectly, open shortly the 
integrated ball valve of the 

fl

 owmeter from time to time 

(the groove vertically).

10.3 Air bleeding

• with the 

fi

 lling pump running, close the bleed valve and 

increase the pressure up to about 5 bar

• close the feed valve and turn off the 

fi

 lling pump, open 

the regulation screw on the 

fl

 owmeter (groove horizon-

tally), do not disconnect the 

fi

 lling pump hoses!

• set the circulation pump(s) to the highest speed and 

repeat switching on and off to air-bleed the system (an 
air-free pump works almost noiselessly)

• watch the system pressure and when it starts falling, 

increase it by turning on the 

fi

 lling pump and opening 

the feed valve to 5 bar

• repeat air bleeding so long until the 

fl

 oat in the 

fl

 owmeter‘s regulation valve takes a steady position 

during pump operation and bubbles stop appearing in 
the 

fl

 owmeter. After that, let the circulation pump run 

for at least 5 minutes.

• in case an automatic air vent/s is/are used anywhere in 

the solar system, close this valve after air bleeding

  10. SYSTEM FILLING, FLUSHING, LEAK TEST AND AIR BLEEDING

10.4 Leak test

• examine the whole system at 5 bar pressure (all con-

nections, solar collectors, valves etc.), no visible leaks 
are allowed. Leave the system under pressure for at 
least 2 hours, then examine the system once again

• consider the test result successful if no leaks appear 

and/or no noticeable pressure drop appears in the 
system

• set the working pressure by point 8.2 Calculation of 

system working pressure

• set the pump to a suitable speed and set the 

fl

 ow by 

the 

fl

 owmeter and data in Tab. 1

• disconnect the hoses of the 

fi

 lling device and screw 

caps on the feed and bleed valves

• 

open entirely

 the ball valve(s) above the pump

• after several days of operation, air-bleed the system 

again. 

Do not 

fl

 ush the system with water. Since it is impossible 

to empty it completely, a risk of frost damage appears.

Fig. 30: Filling a solar system

 

Summary of Contents for KPG1-ALC

Page 1: ...1 1 Solar System with KPG1 ALC Collectors EN v 1 4 Installation and Operation Manual...

Page 2: ...interconnecting 16 6 Temperature Probe Positioning 18 7 Pump Station 19 8 Expansion Vessel Sizing and Working Pressure Calculation 20 8 1 Expansion vessel sizing 20 8 2 Calculation of a system workin...

Page 3: ...ly con sult the fastening method with a structural statics expert During installation the collectors and accessories shall be handled carefully Defects caused by improper hand ling or DIY installation...

Page 4: ...owing chart by the roof type and roofing material Supports and struts for flat roof installation Code Triangle support strut 15 11979 Triangle support strut 25 10975 Triangle support strut 45 6859 Str...

Page 5: ...m 6949 4 M8 nut for the rails 4 pcs 6 pcs 8 pcs 10 pcs 6925 5 M8 16 bolt with allen head 4 pcs 4 pcs 4 pcs 4 pcs 6926 6 Retaining side bracket 4 pcs 4 pcs 4 pcs 4 pcs 10522 10 Retaining bracket betwe...

Page 6: ...pcs 13695 22 mm nipple blind 2 pcs 2 pcs 13696 Nipple 3 4 M M thick wall 4 pcs 2 pcs 6970 3 4 FF elbow brass 1 pcs 1 pcs 10192 T piece in brass 3 4 FFF 1 pcs 7180 X piece in brass 4x 3 4 F 1 pcs 7184...

Page 7: ...boards can be inserted approx distance between boards 1600 1800 mm For roof tiles just shifting them upwards in the length of the auxiliary board is sufficient see Fig 4 Fit the auxiliary boards to ba...

Page 8: ...r Simply lay the anchor onto the roof tiles and fasten it with stainless steel bolts If the roofing is made of e g copper or zinc pla ted iron then the anchor contact surface shall be isolated using s...

Page 9: ...45 150 7 5 e Roofing bolt for rail fastening RIGHT 10 30 mm Fig 8 Right anchor position with roof tiles c Roof anchor of stainless steel or zinc plated steel for pantiles a Stainless steel anchor on...

Page 10: ...the bottom rail 2 brackets per collector Insert the retaining brackets into the bottom rail about 100 mm from the collector edge Lay the first collector carefully on the rails and align it in the bra...

Page 11: ...en the nuts More on this in chapter 5 Hydraulic Connection Continue mounting further collectors in the same way see page 14 48 6 7 5 For passing the connection pipes through a roof e g ventilation til...

Page 12: ...cs 10 pcs 12 pcs 6925 6 M8x16 stainless steel bolt allen head 4 pcs 4 pcs 4 pcs 4 pcs 4 pcs 6926 7 Retaining side bracket 4 pcs 4 pcs 4 pcs 4 pcs 4 pcs 10522 11 Retaining bracket between 2 collectors...

Page 13: ...bow 1 pcs 1 pcs 10192 T piece in brass 3 4 FFF 1 pcs 7180 X piece in brass 4x 3 4 F 1 pcs 7184 3 4 plug gasket brass for code 7628 1 pcs 7954 1 2 3 4 F M brass hex nipple 1 pcs 6964 Single sheath 7x8...

Page 14: ...es cca 350 mm D2 2 4 4 1660 mm T strut base rails L strut D1 Fig 15 Aligning the rails and mounting the first triangular support Assemble the triangular supports that come partially screwed together F...

Page 15: ...ular supports is similar to that of roof anchors in Fig 2 and the last support shall be located about 350 mm from the ends of both rails After fitting the strut and other supports kip the entire struc...

Page 16: ...e first one maintaining a sufficient gap Then put the threaded fittings on both the upper and lower outlets and push the collector to the already mounted one until stop Hold the fitting with a spanner...

Page 17: ...kit for landscape installation code 14134 All solar components must be carefully and safely sealed and must be made of material resistant to glycol and temperatures up to 160 C For connection piping...

Page 18: ...TIONING Tab 1 Recommended pipe diameters AV23 Flow rate regulator with indicator 2 12 l min 3 4 3 8 air discharge valve and 3 8 ball valve up to 160 C Fig 24 Variants of non typical connections Place...

Page 19: ...0 C No shut off valve shall be installed between a safety valve and collectors Fig 26 Solar Pump Station 1 2 3 4 5 6 7 8 9 10 1 Ball valve on flow line red frame thermometer 0 120 C dial with check va...

Page 20: ...ssure in a solar system bar h height from a pressure gauge to the middle of a col lector field m Adjust the pressure by discharging solar liquid after the pressure test is done 8 3 Calculation of expa...

Page 21: ...from the fluid see pic 29 A ball valve shall be always installed under the automatic air vent valve so that the automatic air vent can be clo sed after the system commissioning Solar liquid leaks can...

Page 22: ...ct the filling pump hoses set the circulation pump s to the highest speed and repeat switching on and off to air bleed the system an air free pump works almost noiselessly watch the system pressure an...

Page 23: ...hecked Once a year preferably during a sunny day it is necessary to check the working order and tight fastening of the collectors verify the system tightness and pressure incl pressure in the expansio...

Page 24: ...22 mm 0 8 mm absorber tube material copper absorber tube dimension 12 8 mm 0 5 mm solar absorptance 94 2 emmisivity 5 2 max working pressure 10 bar max working temperature 120 C stagnation temperature...

Page 25: ...v ztr ta kolektoru KPG1 ALC Collector power output in zero point for G 1000 W m2 is 1839 W Momentary collector efficiency over the aperture area for 1000 W m2 insolation Temperature difference between...

Page 26: ...26 84 70 6 1 1 2151 2010 70 1212 1170 21 21 22 15 CONNECTION DIMENSIONS...

Page 27: ...eck pipe insulation Check the proper flow rate Check temperature probes Check the quality of antifreeze liquid with a refractometer Check the heat carrier pressure replenish if necessary Check the con...

Page 28: ...28...

Page 29: ...the service action This Service Action has been carried out by an authorized servicing company Date of Service Action Name of the servicing company Address of the servicing company Name of the servic...

Page 30: ...30...

Page 31: ...31...

Page 32: ...32 02 2015 REGULUS spol s r o Do Kout 1897 3 143 00 Praha 4 http www regulus eu E mail sales regulus cz Your service...

Reviews: