The below listed procedures are valid when a Regulus
pump station is used.
10.1 Filling
• in order to
fi
ll the system, use a
fi
lling device with a
reservoir for solar liquid and a
fi
lling pump (see Fig. 30)
• attach the
fi
lling hose to the feed valve and open the
valve completely
• please use antifreeze solar
fl
uid Regulus - Solarten
super to
fi
ll the system
• attach the return hose to the bleed valve and open the
valve completely
• close the integrated ball valve in the
fl
owmeter (the
groove in the
fl
owmeter‘s adjusting screw must be
horizontal).
• open the check valve (valves - two for a twin-pipe
solar pump station) above the pump by turning the ball
valve by 45° (intermediate position between open and
closed)
• pour suf
fi
cient quantity of solar
fl
uid into the reservoir
of the
fi
lling device, turn on the
fi
lling pump and
fi
ll the
solar system.
10.2 Flushing
•
fl
ush the solar system for at least 15 minutes using
the
fi
lling device. In order to bleed air and possible
impurities from the system perfectly, open shortly the
integrated ball valve of the
fl
owmeter from time to time
(the groove vertically).
10.3 Air bleeding
• with the
fi
lling pump running, close the bleed valve and
increase the pressure up to about 5 bar
• close the feed valve and turn off the
fi
lling pump, open
the regulation screw on the
fl
owmeter (groove horizon-
tally), do not disconnect the
fi
lling pump hoses!
• set the circulation pump(s) to the highest speed and
repeat switching on and off to air-bleed the system (an
air-free pump works almost noiselessly)
• watch the system pressure and when it starts falling,
increase it by turning on the
fi
lling pump and opening
the feed valve to 5 bar
• repeat air bleeding so long until the
fl
oat in the
fl
owmeter‘s regulation valve takes a steady position
during pump operation and bubbles stop appearing in
the
fl
owmeter. After that, let the circulation pump run
for at least 5 minutes.
• in case an automatic air vent/s is/are used anywhere in
the solar system, close this valve after air bleeding
10. SYSTEM FILLING, FLUSHING, LEAK TEST AND AIR BLEEDING
10.4 Leak test
• examine the whole system at 5 bar pressure (all con-
nections, solar collectors, valves etc.), no visible leaks
are allowed. Leave the system under pressure for at
least 2 hours, then examine the system once again
• consider the test result successful if no leaks appear
and/or no noticeable pressure drop appears in the
system
• set the working pressure by point 8.2 Calculation of
system working pressure
• set the pump to a suitable speed and set the
fl
ow by
the
fl
owmeter and data in Tab. 1
• disconnect the hoses of the
fi
lling device and screw
caps on the feed and bleed valves
•
open entirely
the ball valve(s) above the pump
• after several days of operation, air-bleed the system
again.
Do not
fl
ush the system with water. Since it is impossible
to empty it completely, a risk of frost damage appears.
Fig. 30: Filling a solar system
Summary of Contents for KPG1-ALC
Page 1: ...1 1 Solar System with KPG1 ALC Collectors EN v 1 4 Installation and Operation Manual...
Page 26: ...26 84 70 6 1 1 2151 2010 70 1212 1170 21 21 22 15 CONNECTION DIMENSIONS...
Page 28: ...28...
Page 30: ...30...
Page 31: ...31...