OPERATOR’S MANUAL ULTRA GUIDANCE PSR ISO
PAGE 17
CHAPTER
INSTALLATION OF SYSTEM COMPONENTS
3. Installation of system components
Following strict industry standards and safety regulations, ULTRA GUIDANCE PSR is professionally assembled
and installed before it gets used for field operation.
The PSR iBox and various sensors can be exchanged between eight different vehicles.
Any vehicle intended for ULTRA GUIDANCE PSR ISO has to have PSR vBasic installed. The initial installation
has to be done by personnel trained and authorized by Reichhardt for this product. In this manual we describe
only the installation of system components into vehicles which are already auto steer ready.
Attention!
Turn off ULTRA GUIDANCE PSR ISO before attempting any installations by switching the
main switch off (see chapter 4.2.).
After each hardware installation, test the complete system function with the diagnostic program
(see chapter 4.9.4.). This will help to avoid malfunction through, for example, poorly fitting electric
connections.
Make sure to protect connectors after each component change, by using blind caps and plugs to
prevent contamination.
Warning!
Sharp edges or moving parts can lead to hand or skin injuries (crushing, fissures, effusi
-
ons of blood).
3.1.
Installation of ISOBUS-Terminal
In case the ISOBUS terminal should be moved from one vehicle to the other, please gather information in the
operator’s manual of the terminal manufacturer.