background image

1-877-789-3245  |  info@reliance-foundry.com  |  www.reliance-foundry.com

Embedded Mounting

Martello Bollard Installation

Inspect the installation

. Abrasions should be 

covered as soon as possible. For damage repair 

or other servicing needs, please contact Reliance 

Foundry’s sales department.

STEP 15: 

Once aligned, press the cap and concrete anchors 

into the wet concrete until the cap sits flat on the base. 

Note: Be sure to make any necessary adjustments to the 

orientation now. Once the concrete cures, there is no way 

to reposition the cover.

Clean the Bollard

STEP 16: 

Use a cloth to clean the surface of the bollard 

before the concrete cures.

1/2"

STEP 15

R-7651-EM

Reviews: