background image

Flue / Air inlet connection

ø 60 / 100 mm

DHW outlet (cold)

ø 15 mm

gas connection

ø 22 mm

condensate drain connection

3/4" (standard overflow pipe size)

DHW outlet (hot)

ø 15 mm

Flow connection

ø 22 mm

return connection

ø 22 mm

158 mm

pipe safety valve

ø 15 mm

LTALW7H000101b

1

  Check box contents. Ensure that all components are included. Report incomplete delivery to Broag.

LTALW7H000103a

Copper tails

LTALW7H000104b

LTALW7H000105a

3x

3x

3x

LTALW7H000134a

LTALW7H000109a

Instructie service

AvantaPlus

LTALW7H000110a

LTALW7H000111a

LTALW7H000135a

2x

1x

LTALW7H000114a

LTALW7H000116a

ø10 mm

ø10 mm

ø8 mm

1

2

3

4

LTALW7H000117a

LTALW7H000118b

X9

8

7

LTALW7H000126a

LTALW7H000127a

X2

LTALW7H000128b

LTALW7H000129a

Mounting frame 

(including isolation valve set and 
washers)

Avanta Plus 

(including pressure gauge and safety 
valve)

Installation and service
manual

This document contains useful 
and important information for the 
correct installation, operation and 
maintenance. Keep the Installation 
and service manual in a safe 
place together with the other boiler 
documents.

Nylon plugs and screws for
fixing mounting frame

Users guide

Reed the instructions carefully and 
keep the document in a safe place.

Short users guide

Boiler Log Book and warranty
card.

See that the Boiler Logbook has been 
completed by the engineer at each 
service and keep it in a safe place.

DHW inlet
(cold) valve set

 

2

  Mounting Avanta Plus 

Connecting OpenTherm room controls 
(e.g. the Remeha Celcia 15 or 20):
Mount the control in a reference room (usually the living room).
Connect the two-wire interface cables to connectors 7 and 8 of the X9 
terminal strip. When using the Celcia 20 it is possible to add the outside 
sensor to provide weather compensation with room adjustment. 
Connect the outside sensor to connectors 1 and 2 of the X9 terminal strip.

2. 

Drill the (Ø 10 mm) holes; Fit the (Ø 10 mm) 

plugs; Fit (Ø 8 mm) screws into the plugs;
Check the mounting plate is level and tighten the 
screws; Fit the DHW inlet (cold) valve set to the 
mounting plate.

3. 

Fit fibre Washers on HTG Valves.

Suspend the boiler on mounting plate.

3

  Connecting external controls 

1. 

Using the template determine and mark the position 

of the 

three

 mounting holes, making sure the plate is 

absolutely level.

4. 

Connect the valves to the boiler 

remembering to fit fibre washers supplied.
Connect the supplied copper tails to the 
isolating valves.

Connecting the 

(optional)

 two channel time clock.

• Live 230 V supply for the time clock - connect to connectors 1 (N) and 
  2 (L) on X2 terminal strip.
• For HTG - connect the 230 V output from time clock to connector 5 and 
  remove exist link between connectors 1 and 4 of the X2 terminal strip.
• For DHW - connect the 230 V output from time clock to connector 3 
  remove exist link between connectors 3 and 4 of the X2 terminal strip.

4

  Hang up the 

 

Short users guide 

Hang this card underneath or close to the boiler.

Based on the guidelines and the required installation space, determine where to mount the Remeha Avanta Plus. In determining the boiler position, consider carefully the flue outlet position and any pluming consequences. 
Read the Installation and service manual for more details and regulations for mounting the Avanta Plus.

LTALW7H000132a

MOUNTING AVANTA PLUS

Please read the instructions given on this template 
before installing the Avanta Plus.

WITH STANDARD MOUNTINGFRAME

59751-1005

�����

Reviews: