6 Installation
6.1
General
Warning
The boiler must be installed by a qualified installer in accordance
with local and national regulations.
6.2
Preparation
6.2.1
Positioning the boiler
1. Place the boiler in the right position using the transport wheels.
2. Loosen the adjustment bolts and ensure that the boiler is completely
level.
The figure also shows the support surface of the boiler (this is the position
of the adjustment bolts).
6.3
Hydraulic connections
6.3.1
Rinsing the system
The installation must be cleaned and flushed in accordance with BS 7593
(2006) and BSRIA BG 33/2014.
Before a new boiler can be connected to an existing or new system, the
entire system must be thoroughly cleaned and flushed. This step is
absolutely crucial. The flushing helps to remove residue from the
installation process (weld slag, fixing products etc.) and accumulations of
dirt (silt, mud etc.)