14.3 Checklist for commissioning
Tab.50 Checklist
No.
Commissioning tasks
Confirmation
1
Fill the system with water and check the water pressure
2
Fill the siphon with water
3
Vent the central heating system
4
Check water-side connections for tightness
5
Check type of gas offered. Is the boiler is suitable for the type of gas supplied?
6
Check the gas supply pressure
7
Check the capacity of the gas meter
8
Enter the gas type on the data plate
9
Check the gas tightness of the connections and gas pipes
10
Vent the gas supply pipe
11
If installed: check the setting of the Gps minimum gas pressure switch.
12
If installed: check the setting of the Vps pressure switch for gas leakage control.
13
Check the electrical connections
14
Check the flue gas outlet/air supply connections
15
Check the function and operational status of the boiler
16
Check the air-gas ratio
17
Remove the measuring equipment and close the measuring points
18
Set the boiler regulator to the desired values
19
Instruct the user and hand over the necessary documents
20
Confirm the commissioning
Date
.
.
dd-mm-yy
Company name, signature of engineer
.
.