Caution
The transport wheels under the boiler are designed for transport
purposes only and not for use when the boiler is in its final
position.
5.4
Unpacking & initial preparation
1. Cut the packaging straps and remove.
2. Remove the packaging.
3. Unscrew the boiler anchorage on the pallet.
4. Remove the boiler anchorage.
5. Unscrew the loading ramps on the pallet.
6. Fit the loading ramps in front of the pallet.
7. Move the boiler off the pallet.
8. Remove the pallet and the rest of the packaging.
The boiler can now be moved using the transport wheels.
Fig.18
Unpacking the boiler
AD-0001165-01
8
7
6
5
5
3
4x
4 4x
1
2
5 Before installation
26
7665063 - v.05 - 18102018