6.6.2.
Remounting the inspection hatches
1. Replace the lip seal and position it in the visit opening, making sure
that you place its lug outside the DHW tank.
2. Replace the sheet gasket.
3. Fit the unit together.
CAUTION
Use a torque wrench.
Torque applied to the anode: 8 N·m.
The flange mounting bolts must not be excessively tight.
Flange
Torque load
Lip gasket
6 N·m +1/-0
Sheet gasket 15 N·m
Approximately 6 N·m is obtained by manipulating the box
spanner with the small lever and 15 N·m by manipulating
it with the large lever.
4. After reassembly, check the watertightness of the lateral flange.
5. Switch on.
¼
See chapter: "Commissioning procedure", page 47.
L000389-C
1
6x
2
L000594-A
6. Checking and maintenance
200SE-2S - 300SE-2S
58
26/04/2016 - 7607575-05
Summary of Contents for RemaSol200SE-2S
Page 7: ...26 04 2016 7607575 05 5 ...
Page 74: ...en Appendix Information on the ecodesign and energy labelling directives ...
Page 77: ...1 Specific information 4 7607575 ErP02 21042016 ...
Page 78: ......
Page 79: ......