background image

REMKO  

FRESH WATER STATION

BG 500, BG 800, BG 1000

Installation and operating manual 

Edition GB - C06

Summary of Contents for BG 1000

Page 1: ...REMKO FRESH WATER STATION BG 500 BG 800 BG 1000 Installation and operating manual Edition GB C06 ...

Page 2: ......

Page 3: ...nslation of the German original Subject to modifications no liability accepted for errors or misprints Safety instructions 4 Environmental protection and recycling 5 Warranty 5 Intended use 5 Description 5 6 Construction 6 Installation 7 8 Installation orientation of the flow switch 8 Electrical connection 9 Performance diagram 10 On site drinking water circulation system 11 Service notes 12 Explo...

Page 4: ...d can cause malfunctions Units and components may not be operated in areas where there is an increased risk of damage Observe the minimum clearances Safety instructions The electrical supply is to be adapted to the requirements of the units The operational safety of units and components is only assured if they are fully assembled and used as intended Safety devices may not be modified or bypassed ...

Page 5: ...al units with fresh domestic hot water The domestic hot water is only heated when there is demand via a stainless steel plate heat exchanger in a hygienic flow process The energy supply required for this is provided as needed by a heating water storage tank When the hot tap is opened the in tegrated circulation pump is switched on by a flow switch and heating water is conveyed from the heating wat...

Page 6: ...the domestic hot water to be limited to prevent scalding Due to heating water only being sup plied to the plate heat exchanger when it is needed the fresh water station is not susceptible to the formation of scale even in very hard water areas A customer supplied circulation pump can be connected This should not be operated on a permanent basis but ideally after a time delay and using the integrat...

Page 7: ...6 4 x 5 4 and screw into one of the top and bottom connections 3 Seal the two supplied plugs 5 4 and screw into the two corresponding connections in the middle 4 Move the preassembled fresh water station into position attach to the two flat sealing connections union nuts on the top and bottom reducing double nipples then screw tight 5 Fill bleed and flush the storage tank and the fresh water stati...

Page 8: ...he flow switch ensure that the hex nut is pointing upwards like in the diagram Water must flow through the sensor from the bottom to the top in the direc tion of the arrow The detector black plastic part can be fitted to the brass part in any direction Note the orientation when install ing the flow switch cold water connection only from underneath NOTE G 3 4 oder 1 G 3 4 oder 1 G 3 4 or 1 G 3 4 or...

Page 9: ... it has been filled with heat ing water flushed and bled NOTE Before use the fresh water station must be filled and thoroughly and carefully flushed All connections particularly flat sealing connections must be tested for leak tightness and if necessary retightened When bleeding the system note the minimum system operating pressure and if necessary top up M l h L N M t T Flow switch Circulation pu...

Page 10: ... 500 MPS 1000 MPS 800 Bedingungen Temperatur Kaltwasserzulauf 10 C Zapftemperatur am Ausgang der Frischwasserstation 45 C Zapfleistung 10 l min Performance diagram Pour power fresh water station Pour power Liter Temperature of storage tank by beginning of tap C Conditions Temperature cool water intake 10 C Temperature of tap on the outlet of the fresh water station 45 C Tap power 10 l min ...

Page 11: ...p s output will not be adequate to overcome the fresh water station flow monitor s activation threshold of 1 5 l min As soon as a timer is connected on site to the circulation pump and is in operation the following switching will also activate the fresh water station s circulation pump The necessary materials are to be provided by the customer see illustration Junction box on site Connected timer ...

Page 12: ...tank if you proceed as follows 1 Check whether the gravity brake 1 is set to AUTO see figure below 2 Close the upper ball valve 2 3 Set the mixing valve 3 to 20 C 4 If necessary cool the sensors of the mixing valve 4 to temperatures 20 C e g in the water glass 5 The circulating pump and or plate heat exchanger can be removed Water losses will only take place in the components and in the piping 3 2...

Page 13: ... hot water 1120103 1120103 5 Plate heat exchanger 1120058 1120058 6 Flow switch 1120104 1120104 7 Circulation pump UPS 25 60 1120142 1120142 8 Ball valve cold water 1120105 1120105 9 Supply with fused plug 1120106 1120106 10 Drain valve 1120107 1120107 Spare parts not illustrated Cover 1120108 1120108 Exploded view When ordering spare parts please always state the EDP no unit no and unit type see ...

Page 14: ...er connection Inches mm 3 4 19 05 internal thread 3 4 19 05 internal thread Max operating pressure heating water bar 3 3 Max operating pressure drinking water bar 10 10 Nominal flow volume heating water l h 2600 2600 Max tap quantity l min 25 25 Switch on threshold Flow switch l min 1 5 1 5 Weight kg 34 5 36 0 Supply temperature limit C 40 70 40 70 Protection class IP 44 44 Rated voltage V Hz 230 ...

Page 15: ......

Page 16: ...tion too Benefit from our experience and advice REMKO GmbH Co KG Air conditioning and heating technology Im Seelenkamp 12 D 32791 Lage Postfach 1827 D 32777 Lage Telephone 49 5232 606 0 Fax 49 5232 606 260 e mail info remko de Website www remko de ...

Reviews: