17
Proper Use
The units have been designed and equipped exclu-
sively for industrial and commercial heating and ventila-
tion purposes.
The manufacturer assumes no liability for damage re-
sulting from non-compliance with manufacturer specifi-
cations and legal requirements, or if modifications are
made to the units.
2
1
3
Assembly base plate
After completing the adjustments, attach the assembly
base plate using the 4 housing screws.
Setting the pump pressure
For initial burner operation and after each time the
burner is serviced, the oil pressure must be adjusted
and/or checked.
Proceed as follows to adjust the pump pressure
1. Remove the stopper on the “P” measuring connec-
tion.
2. Mount the oil manometer.
3. Open all shut-off fittings in the oil supply.
4. Switch the burner on.
5. Set the required oil pressure in accordance with the
size of the nozzle and the unit performance.
6. Switch the burner off.
7. Disassemble the oil manometer.
8. Replace the stopper and its seal.
Never operate the pump without fuel!
An operation/use other than indicated in these in-
structions is prohibited!
In the case of non-compliance, we assume no li-
ability and our guarantee becomes null and void.
Service and Guarantee
For the guarantee to be valid, the customer must com-
pletely fill out the “guarantee certificate” enclosed with
all heating units and send it back to REMKO GmbH &
Co. KG in a timely manner after purchasing of the unit
and putting it into operation.
The units have undergone several tests to ensure
proper functioning at the factory. If there are still mal-
functions that cannot be fixed by the operator using the
troubleshooting instructions, please contact your dealer
or contract partner.
The guarantee becomes null and void if the cleaning
and adjustment intervals resulting from the unit’s opera-
tion are not observed. Consequently, authorised per-
sonnel must document that this work has been per-
formed. A corresponding maintenance log must be cre-
ated.
Adjusting the secondary air (nozzle connection rod)
1. Using the adjustment screw 1, set the nozzle connec-
tion rod 2 to the label 1.
Adjusting the air intake nozzle
1. Bring the adjustment lever 3 of the air intake nozzle
to position 1.
Important Information
The forced-air burner may only be put into operation by
trained personnel
.
All specifications only serve as presets and must be
set or adjusted after the waste gas has been ana-
lysed.
All REMKO standard heating units must always be
operated with nominal load.
To ensure that the burner functions optimally, it must
be serviced once a year. We recommend entering
into a service agreement for this purpose.