background image

AS-ME-D 

AS-1000-D 

AS-T90-D 

AS-RT-D 

AS-GI-D 

AS-WK-D 

AS-ÜGI-D 

AS-500-E 

Wallconsole 

Examples of Use 

   

Double-sided exhaust system / stainless-steel / 
outside assembly. 

Heating Oil Connection

 

Make sure that there is an adequate supply of fuel. 

   

The installation of the heating oil supply may only be 
performed by authorised personnel in line with the 
local regulations for oil-fired warm air generators. 

   

Particularly for heating oil lines, make sure that the 
cross-section of the lines corresponds to the suction 
height, the total line resistance and increased vis-
cosity at lower temperatures and, if necessary, it is 
possible to connect an oil transport device. 

 

   

The suction line must be equipped with a valve at 
the end of the hose in the tank. 

   

Even when outside temperatures are low, a suffi-
cient amount of heating oil must be able to flow 
freely. Paraffin can accumulate at temperatures 
starting at approximately 5 °C depending on the 
quality of the heating oil. 

 

Appropriate measures must be taken to prevent this 
from happening. 

Burner Installation 

The forced-air burner supplied by the manufacturer is 
attached to the front of the unit with a clamp flange. 

You must observe the following: 

   

Only forced-air burners with a automatic burner relay 
that have a 5 sec. safety period may be used. 

   

The burner must be adjusted to the full heat load of 
the unit. 

   

The combustion chamber may not be operated be-
low capacity. 

   

The exhaust temperature may not fall below 160 de-
grees Kelvin above the room temperature. 

Condensation accumulation. 

   

Follow the operating instructions of the burner sup-
plied by the manufacturer. 

   

If burners from other manufacturers are used, they 
must be checked for compatibility with the unit. 

Fan Motor Connection 

The units are completely wired at the factory. 

If modifications are made or the fan motors are re-
placed, make sure that the motor is properly connected. 

Exhaust Connection 

The exhaust connection must be made properly in ac-
cordance with the relevant regulations. 

   

Proper exhaust expulsion must be ensured. 

   

The exhaust connection may only be made to a pre-
viously approved exhaust system. 

When planning for the exhaust system, please observe 
the following: 

   

The exhaust system must be installed and assem-
bled properly and in accordance with the relevant 
regulations. 

   

The dimensions of the exhaust lines must be adjusted 
to the capacity of the unit and the construction height. 

   

The dimensions of the exhaust systems must ensure 
that the exhaust is expelled to the outside regardless 
of the operating conditions and guarantee that no 
positive pressure is produced in the rooms. These 
dimensions are based on the cross-section and 
height, and to the extent required, the heat penetra-
bility resistance and internal surface. 

   

The exhaust system openings must stick out at least 
40 cm beyond the top of the roof or be at least 1 m 
away from the surface of the roof. 

   

If impact pressures, e.g. from fall winds or 
neighbouring buildings, are anticipated, the top of 
the chimney should be shaped accordingly. 

   

In roof structures, the exhaust system must be led 
through a pipe casing or a chute to allow the ex-
haust line to expand when heated. 

   

The unit connection must be impermeable and se-
cured with rivets or screws from becoming acciden-
tally loose. 

 

Installation of an exhaust system always requires  
a permit.

 

Summary of Contents for WKL 20 INOX

Page 1: ...REMKO powerful like a bear REMKO WKL 20 INOX Oil compact heating system Edition GB P11 Operation Technology Spare Parts...

Page 2: ......

Page 3: ...Oil Burner Assembly 16 Initial Operation 16 Service and Guarantee 17 Maintenance Log 18 Stationary Warm Air Heating System REMKO WKL 20 INOX Read these instructions carefully before setting up operati...

Page 4: ...connect the units to an exhaust system approved by the state building authorities The units are equipped with a 1 speed radial fan with drive motor that runs quietly and requires little mainte nance a...

Page 5: ...bend the capillary tubes near to solder points When installing the capillary tubes be careful not to damage or bend them too sharply The sensors may only be mounted in the mounting brackets supplied b...

Page 6: ...tup room but not close to hazardous areas Air Supply for Combustion An adequate supply of air for combustion must be en sured by meeting the relevant building requirements Excerpts from the German fir...

Page 7: ...e units the regional provisions and regulations must be observed The units may only be operated with accessories that have either been approved by the manufacturer or sup plied with the units Proceed...

Page 8: ...f the burner sup plied by the manufacturer If burners from other manufacturers are used they must be checked for compatibility with the unit Fan Motor Connection The units are completely wired at the...

Page 9: ...If the unit is not set to its rated heat load or it is too large for the necessary heat requirements the burner only runs in cyclical operation Because the required operating temperature is not reache...

Page 10: ...er Combustion residue in the com bustion chamber and in the heat exchanger must be removed Parts that wear out e g flue gas brakes oil nozzles oil filter inserts seals etc must be checked cleaned and...

Page 11: ...and capillary pipes of the safety temperature limiter STB and the temperature moni tor TW for damage and ensure that the sensor has been properly positioned Check whether the red control light burner...

Page 12: ...max unit without burner kW 0 17 Power consumption max for manufacturer supplied burner kW 0 28 Sound pressure level LpA 1m without burner dB A 58 Waste gas connection mm 130 Weight Unit without burne...

Page 13: ...ture limiter TH Optional Room thermostat or day night regulator TR Fan control thermostat TW Temperature monitor WS Wieland plug We reserve the right to make modifications in dimensions and constructi...

Page 14: ...Exploded View 4 1 2 5 3 13 8 9 12 11 7 3 4 10 16 15 20 18 19 17 21 22 23 26 25 27 14 24 6 We reserve the right to make modifications in dimensions and construction in the interests of technical progre...

Page 15: ...ction grille 289109 16 Fan cpl 1108606 17 Seal for inspection cover 1103156 18 Inspection cover with waste gas connection 1103155 19 Waste gas suppressor set 6 piece 1103157 20 Fan control thermostat...

Page 16: ...manually but not so that they are completely tight initially The sliding flange still has to be tightened 4 Push the flame pipe into the burner chamber until it clicks into place 5 Connect the flame p...

Page 17: ...the guarantee to be valid the customer must com pletely fill out the guarantee certificate enclosed with all heating units and send it back to REMKO GmbH Co KG in a timely manner after purchasing of t...

Page 18: ...damage Maintenance burner Test run Model Model No Burner Burner No Maintenance work may only be performed by authorised personnel settings must comply with legal specifications A corresponding test lo...

Page 19: ......

Page 20: ...REMKO GmbH Co KG Klima und W rmetechnik D 32791 Lage Im Seelenkamp 12 D 32777 Lage PO Box 1827 Phone 49 5232 606 0 Fax 49 5232 606 260 E Mail info remko de Internet www remko de...

Reviews: