3.3 Basic features

The N1-HV series hybrid inverters apply to PV energy storage system with PV module, battery, loads and grid.

The N1-AC series AC coupled inverters apply to energy storage system with  battery, loads and grid.

The energy produced by PV system shall be used to optimize self-consumption, excesspower charge battery and the rest power 

could be fed into the grid. Battery shall be discharged to support loads when PV power is insufficient to meet self-consumption. If 

both PV power and battery power is insufficient, the system will take power from grid to support loads.

Work mode: Back up mode

Priority: battery>load>grid

This mode applies the area that has frequent power outages. And this mode ensures the battery will has enough energy to 

supply during a grid outage.   The back up load could be supported by PV and battery in the event of a blackout.

1)  Generated solar energy

2)  Storage in Battery

3)  Load consumption

4)  Grid supply power

Figure 3-2 Terminals

2

4

1

3

WARNING!

Make sure the load powering rating in within the EPS’s output rating. Or 

the inverter will shut down with an ‘over load’ warning.

When an ‘over load’ is appeared, adjust the load power make sure it is with 

the range of the EPS output, and turn the inverter on.

For the nonlinear load, please pay attention to the inrush power make sure 

it is within the range of the EPS output.

A B C E

F

G

D

H

4 Technical data

Figure 3-3 Dimension

Object

DC switch

PV connector(Only for N1-HV series inverter)

Battery connector

WiFi or GPRS port

A

B

C

D

E

F

G

H

Communication port

SD port

EPS port

AC port

Description

Object

Description

3.4 Dimension

Priority: battery>load>grid

5500

9000

4500 

7500 

600

120~550

360

150

2

1

13.5/13.5

Integrated

Model

PV Input Data

N1-HV-5.0

N1-HV-3.68

N1-HV-6.0

N1-HV-3.0

Max. Recommended PV Power (W)

Max.DC Input Voltage (V)

MPPT Voltage Range (V)

Rated DC input voltage (V)

Start-up  Voltage

No. of MPP Trackers

No. of Input Strings per  Tracker

Max. DC Input Current (A)

DC Switch

Summary of Contents for N1-AC Series

Page 1: ...N1 HV 3 0 N1 HV 3 68 N1 HV 5 0 N1 HV 6 0 N1 AC 3 0 N1 AC 3 68 N1 AC 5 0 N1 AC 6 0 UserManual Series N1 HV AC...

Page 2: ...nsportdamage 13 5 3 Installationprecaution 13 5 4 Availablespace 13 5 5 Preparation 13 5 6 Installationsteps 15 5 7 ElectricalWiringConnection 16 5 7 1 PVWiringConnection 17 5 7 2 BatteryConnection 18...

Page 3: ...t 2 2Important safety instructions 1 2 Target group This manual is intended for quali ed electrical technical personnel who are responsible for hybrid inverte AC coupled installation and commissioning...

Page 4: ...ill void warranty and warranty claims and in most cases termi nate the operating license When the enclosure lid is removed live components can be touched which can result in death or serious injury du...

Page 5: ...rority 1 Generated solar energy 2 Load consumption 3 Storage in battery 4 Feed the excess solar energy into the grid 1 Load consumption 2 Feed into grid 3 Charge the battery 3 4 1 2 3 2 1 This mode ap...

Page 6: ...blackout 1 Generated solar energy 2 Storage in Battery 3 Load consumption 4 Grid supply power Figure 3 2 Terminals 2 4 1 3 WARNING Make sure the load powering rating in within the EPS s output rating...

Page 7: ...rated Duration s Max Efficiency Euro Efficiency MPPT Efficiency Max Battery Discharge Efficiency DC Insulation Monitoring Input Reverse Polarity Protection Anti island Protection Residual Current Moni...

Page 8: ...5 Make sure the installation site does not fall into one of the following conditions Do not install the inverter in direct sunlight Do not install the inverter on ammable construction material Do not...

Page 9: ...ake sure the 4 mounting bars on the back of the inverter is xed well with 4 grooves on the bracket Drill holes with 10 driller carefully make sure the holes are deep enough at least 45mm for install a...

Page 10: ...ugs are similar with PV plugs please con rm before use it 1 Turn off the DC switch 2 Prepare 2 5 4mm2 PV cable and PV plugs as below 3 Strip 7mm of the conductor with stripping plier Use a suitable st...

Page 11: ...tery Power Cable Connection 1 Prepare the tin plated cables with a conductor cross section of 4 to 6 mm AWG 10 2 Strip 15mm off the conductor Use a suitable stripping tool for this e g Knipex Solar 12...

Page 12: ...land torque 4 Nm 5 Nm Make sure that the rib of the terminal block and the groove on the housing engage perfectly until a Click is heard or felt 5 7 3AC Output Connection N1 HV AC series inverters hav...

Page 13: ...uirements of local Australian grid code AS NZS 4777 2 which among speci c requirements for connection calls for compatibility with Demand Response Enabling Devices DRED The DRED is under control of a...

Page 14: ...g Comm Addr PV Connection Comm OK PV Connection Multi OK Settings Data Time Work Mode PV Config Normal Power W Battery XX XX XX XX XX Normal Ppv W Pbat W Normal Pac W Pfeed W Pload W Normal ENV_S Char...

Page 15: ...OK Feature Remote Control DRM0 Meter Setting Meter Setting Disable OK Normal Power W Battery XX XX XX XX XX Normal Ppv W Pbat W Normal Pac W Pfeed W Pload W Normal ENV_S Charger_S Inv_S Normal WorkMo...

Page 16: ...Time Use OK Work Mode Backup Use OK Work Mode Feedin Use OK Work Mode FFR Use OK This function can set the mode of PV input There are two modes for selection Comm and Multi The Comm mode means single...

Page 17: ...Press up or down button to set the parameters of battery Press OK to con rm I Off Grid Battery Battery Awaken No OK Battery Dischr Max Curr 25 0A OK Battery Chr Max Curr 25 0A OK Battery Min On Grid S...

Page 18: ...k help from us if not go back to normal state Grid is lost System will reconnect if the utility is back to normal Or seek help from us if not go back to normal state Grid voltage out of range System w...

Page 19: ...seek help from us if not go back to normal state Other device fault Turn off the PV battery and grid reconnect them Or seek for help from us if cannot back to normal The residual current circuit is f...

Page 20: ...Have it carried out according to local waste handling regula tions Please be sure to deliver wasted inverters and packing materials to certain site where can assist relevant department to dispose and...

Reviews: