15
Starting the inverter:
1) Close the DC and AC circuit breaker;
2) If the solar panels provide enough energy, the power module will work and the LCD panel will be lit;
3) In case you are starting the inverter for the first time, the inverter needs to be commissioned.
Commissioning is described on page 16,chapter 4.2.
4) Then the inverter will turn into self-check mode and the LCD panel will display the remaining time of
connect simultaneously;
5) After the inverter turn into normal mode, it feed electrical energy into grid, and LCD panel will display the
generated electrical energy.
As long as the inverter works, it will automatically track the maximum power point to absorb the maximum
energy from solar. When night comes, the irradiance is not strong enough to provide energy, the inverter will
power off automatically. When the next day comes, the input voltage reaches the start value, it will start again
automatically;
4. User Interface
4.1 Led and key
Figure 4-1 LED display
No
Name
Description
1
ESC Button
ESC Operation, Leave from current interface or function.
2
Up Button
Up Operation, Move cursor to upside or increase value.
3
Down Button
Down Operation, Move cursor to downside or decrease value.
4
Enter Button
Enter Operation, confirm the selection.
5
Run (Green LED)
Green LED is on, Normal working Status.
6
Fault (Red LED)
Red LED is on, fault.
7
Warning (Yellow LED)
Yellow LED is on, Warning.