background image

                                                                            

3

 

 

1.3 Important safety information                                                 

Read this before installing, operating or maintaining the inverter. 

 

1.4 System sizing                                                           

 

When dimensioning a photovoltaic system, it must be ensured that the open circuit voltage 
of the PV string never exceeds the maximum permissible input voltage of 600V DC. The PV 
string open circuit voltage during parallel string operation is 550V.  Higher voltages may 
result in permanent damage to the inverter. 

The selection of PV string output should be based on the optimum utilization of the invested capital compared 

to the expected annual energy yield from the system. This optimization depends on local weather conditions 

and should be considered in each individual case. 

The inverter incorporates an input power limiting device, which automatically keeps the power at levels that are 

safe for the inverter. The limitation depends mainly on internal and ambient temperatures. The limitation is 

calculated continuously and always allows the maximum possible amount of energy to be produced. 

Please use the tool supplied by Renac Power when dimensioning a photovoltaic system. 

 

 

 

 

 

 

Before installation: 

Check for damage to inverter and packaging. If you are in doubt, please contact your 
supplier before installing the inverter. Check the voltages of the solar modules and make 
sure they are within the limits of the inverter specifications before connecting them to the 
inverter. 

Installation: 

Only trained and authorized personnel familiar with local electrical codes may install the 
inverter. For optimum safety, please follow the steps described in this manual. Keep in mind 
that the inverter has two voltage carrying sides, the PV input and the AC grid. 

Disconnecting the inverter: 

Always disconnect the AC line first! Afterwards disconnect the PV lines. Note that the 
inverter can still be charged with very high voltages at hazardous levels even when it is 
disconnected from grid and solar modules. Wait at least 5 min. before proceeding, after 
having disconnected from grid and PV panels. 

Operating the inverter: 

Before connecting the AC grid to the inverter, make sure that the installation cover is 
mounted again. The inverter must not be open during operation. 

Maintenance and modification: 

Only authorized personnel are allowed to repair or modify the inverter. To ensure optimum 
safety for user and environment, only the original spare parts available from your supplier 
should be used. 

Functional safety parameters: 

Unauthorized changes of functional safety parameters may cause injury or accidents to 
people or inverter. Additionally it will lead to the cancelling of all inverter operating approval 
certificates.

 

Summary of Contents for NAC4K-DS

Page 1: ...0...

Page 2: ...n 8 3 2 Installation environment 8 3 3 Installation position 9 3 4 Mounting procedure 10 3 5 Electrical connection 11 3 6 Starting the inverter 14 4 User interface 14 4 1 Led and key 14 4 2 LCD displa...

Page 3: ...ghout the manual important information is shown at different levels depending on the character of the information as shown here Safety information important for human safety Violation of warnings may...

Page 4: ...fore installing the inverter Check the voltages of the solar modules and make sure they are within the limits of the inverter specifications before connecting them to the inverter Installation Only tr...

Page 5: ...ters 2 1 Mechanical design Figure 2 1 shows the outline dimensions of NAC4K DS NAC5K DS NAC6K DS NAC7K DS NAC8K DS Figure 2 1 Outline dimensions Figure 2 2 shows the electrical terminals of NAC4K DS N...

Page 6: ...3 I O Port 4 Communication port 5 AC terminal 6 LCD 7 LEDs Run Fault 8 Key 2 2 Electrical system design Figure 2 3 wiring diagram of the inverter system Please refer to chapter 3 for the detail conne...

Page 7: ...DC Insulation Monitoring Integrated Input Reverse Polarity Protection Integrated Anti island Protection Integrated Residual Current Monitoring Integrated Over heat Protection Integrated AC Overcurrent...

Page 8: ...49 CZ Czech Republic power Grid meet Grid standards EN50438Y2007 CZ 20 IEC61727 India power Grid 21 Korea Korea power Grid 22 EN50549 SW Sweden power Grid 23 China W China power Grid Grid voltage rang...

Page 9: ...DS and 3 PV connectors for NAC7 8K DS There are 2 PV connectors for NAC4 5 6K DS and 3 PV connectors for NAC7 8K DS Figure 3 1 package information 3 2 Installation environment 1 In order to achieve o...

Page 10: ...must be suitable for the inverter s weight and dimensions 2 Mount on a solid surface 3 Select a well ventilated place sheltered from direct sun radiation Figure 3 3 installation position In considerat...

Page 11: ...holes in the wall according to the dimensions Step2 Fix the wall mounting bracket on the wall with 4 expansion bolts in accessory bag Setp4 Place the inverter on the wall mounted bracket and install...

Page 12: ...inverter There are 2 trip thresholds for the RCD as required for certification IEC 62109 2 2011 The default value for electrocution protection is 30mA and for slow rising current is 300mA Connect the...

Page 13: ...s with DC connector otherwise it will cause damage to inverter 3 Make sure the maximum open circuit voltage Voc of each PV string does not exceed the inverter input voltage Vmax under any condition 4...

Page 14: ...d 1000m 2 Communication lines must be separated from other power lines to avoid communications interference Remark RS485 port PIN3 A PIN4 B Figure 3 9 RS485 Port Figure 3 10 RS485 in multiple series F...

Page 15: ...ge 16 chapter 4 3 Step4 Then the inverter will turn into self check mode and the LCD panel will display the remaining time of connect simultaneously Step5 After the inverter turn into normal mode it f...

Page 16: ...er W Clear events Power W Factory setting Power W Clear E total Power W PF xxx Power W Setting Add Pac W Factory setting English Factory setting VDE4105 Factory setting 2 Factory setting Factory setti...

Page 17: ...xport power 5 Set Export power as 1 press pushbutton long to save the value 4 7 Self Test in accordance with CEI 0 21 Applies to Italy only The self test is only required for inverters which are commi...

Page 18: ...ys setting Other AUTOTEST enter into Auto Test interface 4 Click Execute to start the test 5 The inverter will automatically run the test until the screen shows Test end 6 Click Read to read the test...

Page 19: ...Detailed information about the entire system modules circuits etc 5 Documentation of previous claim exchanges if applicable In the case of an exchange the remainder of the warranty entitlement will b...

Page 20: ...bility 4 If grid is ok and the problem exists still maybe the fuse in the inverter is open please call service Low Temp Over Temp 1 The internal temperature of inverter is higher or lower than specifi...

Page 21: ...20 P N 422 00022 02...

Reviews: