Installation for 4 - 6 axes with head cable exceeding 25 m and thermal effect
compensation (TEC)
Key
Description
Key
Description
1
Orange head cable
7
25 V - 80 V power supply (not
supplied)
2
Cat 5 300 mm cable (supplied)
8
Air filter
3
16 / 0.2 mm earth connection
9
48 V power supply (supplied)
4
MCU connection
10
E-STOP link cable (supplied)
5
Cat 5 ethernet cable (5 m cross-
over cable supplied) to host PC
11
Head comms signal booster
6
24 V power supply (supplied)
12
TEC input
The REVO-2 head and CMM system are operated through UCCserver which uses I++DME command protocol to communicate between the
system application software and the UCC S5.
Full 5-axis scanning capability is achieved through interaction between the UCC S5, the REVO-2 and the SPA3, to co-ordinate all the motion
and metrology aspects across the three CMM axes and the two head axes.
REVO-2 user's guide
www.renishaw.com
Issued 07 2019
18