3.3 Compressor start-up
This section covers important information which you need to
observe in order to safely start up the compressor.
Each component of the machine is tested at the factory opera-
tion at final assembly. The test ensures that the components
operate fault-free. During the initial hours of operation the ma-
chine should be watched to determine any possible malfunc-
tions.
Important!
The respective operating manuals must be read and observed
for machines with additional optionally installed components
(e.g. refrigerant dryer).
The following points must be observed and carried out before
the first start-up:
Step
Task to be carried out / Points to be ob-
served:
1
Have an electrician tighten all screw and terminal
connections in the control cabinet
2
A clearly visible sign must be affixed to machines with
remote control with the following wording:
Warning! This machine is remote controlled and
may start without warning!
During remote control of the system, safety precau-
tions must be followed that prevent the system from
starting when it is being checked or maintained. (Main
switch of the system must be turned off!)
Contents
General points
Preparation
Summary of Contents for Scroll Line Industry Series
Page 60: ...Appendix T Data sheets 015x765x1462 AT Appendix Data sheets AT...
Page 62: ......
Page 63: ......
Page 64: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 92: ...A ADS Appendix Pressure Switch AADS 2 Appendix ADS End Pressure Switch...