5 Maintenance
5 - 2
5.1 What to take into account
This section contains general information you need to follow
when carrying out servicing and maintenance work.
Only specialists or persons properly instructed must conduct
any maintenance and repair work. The "large maintenance"
(5.000 & 10.000 hours at 10 bar SCROLLs and 10.000 hours at
8 bar SCROLLs) must only be completed by authorised* per-
sons.
(* The corresponding qualifications can be obtained from
RENNER in special technical courses)
An overview of the personnel requirements are found in Chap-
ter 0.
Danger!
It is essential to adhere to the following safety instructions in
order to avoid all risks of personal injury or death:
Potential Source of Danger Preventive Measures
Crushing from moving
parts
Always maintain a safe dis-
tance from all moving parts
when carrying out test runs
electrical shock.
Switch off all power supplies
before starting work.
Take measures to prevent
power supplies from being
switched on again by acci-
dent
Inappropriate spare parts
Always replace self-locking
nuts and screws
Only use spare parts includ-
ed in the RENNER spare part
list
Unauthorised/premature
approval of compressor
system.
Do not release the unit for
operation until the safety de-
vices are fully functional.
Only then is the work com-
pleted!
Contents
Personnel
requirement
Summary of Contents for Scroll Line Industry Series
Page 60: ...Appendix T Data sheets 015x765x1462 AT Appendix Data sheets AT...
Page 62: ......
Page 63: ......
Page 64: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 92: ...A ADS Appendix Pressure Switch AADS 2 Appendix ADS End Pressure Switch...