6 Decomissioning and Disposal
6 - 2
6.1 Decommissioning the system
Here you will find information which you will need to observe if
you need to decommission the compressor for a longer period
of time and the points you need to observe when re-
commissioning the compressor after this period.
For longer periods of decommissioning prepare the unit as
follows:
Step
Operation
1
Disconnect the compressor from the power supply
to prevent accidental switching on of the machine by
third parties (e.g. lock the power cable in the
machine).
2
Remove the tension on the V-belt (see Chap.5 S-10
"Tighten/replace V-belt").
3
Do not cover the unit in such a way so that there is
no ventilation - this will enforce corrosion of various
parts.
Contents
Decommissioning
the plant
Summary of Contents for Scroll Line Industry Series
Page 60: ...Appendix T Data sheets 015x765x1462 AT Appendix Data sheets AT...
Page 62: ......
Page 63: ......
Page 64: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 92: ...A ADS Appendix Pressure Switch AADS 2 Appendix ADS End Pressure Switch...