LP3-500 Owner’s Manual | 8
SYSTEM START-UP PROCEDURES
(continued)
CHECK THE PRODUCT WATER PRESSURE SWITCH
If your system is equipped with a product water pressure
switch, it is preset at the factory to shut the system down at 45
PSI, and restart the system at 25 PSI. Its purpose is to stop and
start the system when a pressurized storage tank is used. If the
product water pressure switch is not shutting down the system
when the pressurized storage tank is full, refer to the section in
this manual titled “System Pressure Switches.”
PRODUCT WATER CONNECTION
For convenience, we recommend installing a tank shut-off
valve prior to the pressurized storage tank. The storage tank
may take several hours to fill with product water.
FINAL INSPECTION
Once the above procedures are completed, visually inspect all
water connections. Check to be certain that all connections are
tight and secure.
CAUTION
– A water softener should not
be allowed to regenerate while the Reo-Pure
system is operating; unless safeguards are
used to be sure the system is shutdown or
operating on an alternate source of softened
water.