Page 19 / 51
3 SYSTEM STARTUP AND OPERATION
3.1 Check List Prior to System Startup
Prior to system startup, use the table below to make sure all parts have been installed and
connected, and quality of pure water meets minimal requirements.
Check List
Feed water quality
Pure water: Conductivity < 10
0 μS/cm (at 25 °C),
Total Organic Carbon (TOC) < 50 ppb,
Water temperature: 5
– 45
℃
,
Pressure: 0
– 15 psi (0 – 1 bar)
Feed water connected
Control console connected
Dispenser installed and connected
Power adapter plugged in
Note: Cartridges will be installed after system power-up. DO NOT install them now.