Oct 21/16
9101
8 - 25
14.
Position raft so inflation valve pull cable loop and threaded outlet protrudes through the small
round hole in the vacuum bag. Replace vacuum washer and vacuum retainer over pull cable loop
being sure the vacuum washer is positioned so the flange side of the washer is secure against the
bag. Tighten vacuum retainer to a snug fit with the vacuum bag retainer wrench. DO NOT
OVER-TIGHTEN. (See Fig. 13)
15.
Before sealing the vacuum bag, be sure the raft is secure inside.
16.
Heat seal open top of bag leaving an approximately 2in. open gap near the corner. Be sure there
are no gaps in the sealed area or bag will not vacuum properly. (See Fig. 14)
17.
Insert vacuum hose into the open gap in the bag until it is positioned inside the folds of the raft.
Evacuate the bag while maintaining constant pressure on the raft to condense it as much as
possible. (See Fig. 14)
18.
Remove hose and quickly seal corner opening.
TIP!
Leave corner of vacuum bag visible for future services.
Packing into Valise
19.
Open valise and lay flat.
20.
Place vacuum packed raft into valise with cylinder oriented toward the bottom and closest to the
hole in the side of the valise. (See Fig. 15A)
21.
Place painterline sachet assembly lengthwise on top of the vacuum sealed raft with the cord
facing the inflation valve. Tape down with black gaffers tape (Part No. 10-TAPE-4).
(See Fig. 15A)
22.
Measure 1ft. from the exposed portion of the painterline cord closest to the loop patch on the
vacuum bag. Using a screwdriver or another similar object, create a hole in the painterline.
CAREFULLY slip cord over the inflation valve pull cable loop and drag it down until it has cleared
the loop. Bring the end of the cord back through the loop and tie using a bowline knot.
(See Fig. 16)
23.
Tie the end of the same painterline cord to the exterior loop patch on the vacuum bag. Leave
1in.-2in. worth of additional line and tape down with white adhesive tape. Tape should extend
1in. past the extra length of material. (See Fig. 12)
24.
Pass the end of the other painterline cord through the hole in the valise and secure to the back
end of the valise painterline pocket flap with a bowline knot and white adhesive tape. Tape
should extend 1in. past the extra length of material. (See Fig. 15A)
25.
Tuck painterline back into the valise and close the velcro patch.
Summary of Contents for 45-AE4V
Page 2: ......
Page 4: ...June 2 08 RR 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 6: ......
Page 8: ...June 2 08 SB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ......
Page 19: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9101 AP 1 AP None Listed...
Page 20: ...June 2 08 AP 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 22: ...June 2 08 AB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 24: ...June 2 08 TC 2 9101 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Page 26: ...June 2 08 1 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 30: ...June 2 08 2 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 32: ...FIGURE 1 COASTAL AND AERO ELITE Oct 21 16 2 4 9101...
Page 33: ...FIGURE 2 OFFSHORE ELITE June 2 08 9101 2 5...
Page 34: ...June 2 08 2 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 39: ...FIGURE 3 VALISE AND CONTAINER June 2 08 9101 2 11...
Page 40: ...FIGURE 4 INFLATION SYSTEM June 2 08 2 12 9101...
Page 44: ...July 13 11 2 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 46: ...FIGURE 5 DEPLOYMENT July 13 11 2 18 9101...
Page 47: ...DISASSEMBLY June 2 08 9101 3 1 3 General 3 Procedures 5...
Page 48: ...June 2 08 3 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 50: ...June 2 08 3 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 54: ...FIGURE 2 REMOVAL FROM CONTAINER VALISE June 2 08 3 8 9101...
Page 55: ...FIGURE 3 DISCONNECTING THE PAINTERLINE June 2 08 9101 3 9...
Page 56: ...FIGURE 4 REMOVAL FROM VACUUM BAG July 13 11 3 10 9101...
Page 57: ...FIGURE 5 UNFOLD RAFT DISENGAGE THE CYLINDER June 2 08 9101 3 11...
Page 58: ...June 2 08 3 12 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9101...
Page 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9101...
Page 66: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9101...
Page 73: ...FIGURE 1 LEFT CHAMBER INFLATION COASTAL July 13 11 9101 4 15...
Page 74: ...FIGURE 3 UPPER CHAMBER INFLATION OFFSHORE June 2 08 4 16 9101...
Page 75: ...FIGURE 5 DIGITAL MANOMETER Feb 20 13 9101 4 17...
Page 76: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 18 9101...
Page 82: ...June 2 08 5 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 84: ...June 2 08 5 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 86: ...June 2 08 5 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 88: ...June 2 08 6 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 90: ...June 2 08 6 4 9101 THIS PAGE INITIALLY LEFT BLANK...
Page 92: ...June 2 08 6 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 94: ...June 2 08 6 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 96: ...June 2 08 6 10 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 98: ...June 2 08 7 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 100: ...June 2 08 7 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9101 7 13...
Page 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM July 13 11 7 14 9101...
Page 112: ...June 2 08 7 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 114: ...June 2 08 8 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 116: ...June 2 08 8 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 119: ...FIGURE 2A SEA ANCHOR PREPARATION June 2 08 9101 8 7 FIGURE 2B STOWING PAINTERLINE...
Page 120: ...FIGURE 3 CONTAINER SPECIFICATIONS June 2 08 8 8 9101...
Page 122: ...FIGURE 4B 120in TIE LINE CONNECTION July 13 11 8 10 9101...
Page 140: ...FIGURE 5 TOPPING OFF INFLATE DEFLATE VALVE July 13 11 8 28 9101...
Page 141: ...FIGURE 7 STOWAGE OF COMPONENTS June 2 08 9101 8 29...
Page 143: ...FIGURE 8B FOLDING DIAGRAM STEP 2 July 13 11 9101 8 31...
Page 144: ...FIGURE 8C FOLDING DIAGRAM STEP 3 July 13 11 8 32 9101...
Page 146: ...FIGURE 8E FOLDING DIAGRAM STEP 5 Feb 20 13 8 34 9101...
Page 147: ...FIGURE 8F FOLDING DIAGRAM STEP 6 July 13 11 9101 8 35...
Page 148: ...FIGURE 8G FOLDING DIAGRAM STEPS 7 8 July 13 11 8 36 9101...
Page 149: ...FIGURE 9 BURST STRAP ATTACHMENT July 13 11 9101 8 37...
Page 150: ...FIGURE 10 GASKET REMOVAL July 13 11 8 38 9101...
Page 151: ...FIGURE 12 ATTACHMENT OF MOORING PAINTERLINES July 13 11 9101 8 39...
Page 152: ...FIGURE 14 SEALING BAG July 13 11 8 40 9101...
Page 153: ...FIGURE 15A PLACING BAG IN VALISE July 13 11 9101 8 41...
Page 154: ...FIGURE 16 INFLATION VAVE PAINTERLINE CONNECTION June 2 08 8 42 9101...
Page 155: ...FIGURE 18 CONTAINER STRAPS Feb 20 13 9101 8 43 FIGURE 19 HEAT SHRINK SLEEVES...
Page 156: ...FIGURE 20 TAPE FOR STRAPS AND PAINTERLINE Feb 20 13 8 44 9101...
Page 157: ...STORAGE June 2 08 9101 9 1 9 General 3...
Page 158: ...June 2 08 9 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 160: ...June 2 08 9 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 161: ...TOOL EQUIPMENT AND MATERIALS Feb 20 13 9101 10 1 10 General 3 Tool List 5...
Page 162: ...June 2 08 10 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 164: ...June 2 08 10 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 168: ...Feb 20 13 10 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 170: ...June 2 08 11 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 174: ...June 2 08 11 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 176: ...June 2 08 11 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 182: ...Feb 20 13 11 14 9101...
Page 186: ...FIGURE 2 CYLINDER VALVE ASSEMBLY June 2 08 11 18 9101...
Page 188: ...FIGURE 3 INFLATION VALVE ASSEMBLY June 2 08 11 20 9101...
Page 190: ...FIGURE 4 CONTAINER ASSEMBLY July 13 11 11 22 9101...
Page 204: ...Feb 20 13 11 36 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 205: ...SPARE PARTS LIST Feb 20 13 9101 12 1 12 Introduction 3 Image List 5 Tool Image List 21...
Page 206: ...Feb 20 13 12 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 208: ...Feb 20 13 12 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 229: ...Feb 20 13 9101 12 25 Description Part Number O Ring Install Kit 95 EOIK34...
Page 230: ...Feb 20 13 12 26 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 232: ...July 13 11 9101 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 234: ......