Transducer Connection
9. Unscrew the gland nut and the screw terminal cover, disconnect the wires, swap their positions, and then tighten
each securely. Tighten down the screw terminal cover and the cable gland nut, reconnect to the PLC or CT at the
head end and repeat 7) above ensuring the multimeter displays a positive voltage reading then disconnect the
cable from the test box and connect it to the converter box.
10. If the multimeter reads more than +5V dc or less than -5V dc, further investigation by a qualified electrical
technician is required. If the incoming signal is to the correct 0 to 5V dc signal, a multimeter connected red to red
and black to black on the test box will never show greater than +5V dc or less than -5V dc. If the voltage is out of
range, do not connect the CT cable to the converter box.
11. If, and only if, a successful test was achieved, remove the polarity test box and connect the EN2 connector on the
end of the cable from the VSCC9001 to the lower Left Hand (Yellow) port on the converter box. Check that after
the equipment is back in service that motor power draw is being sent to the cloud and the scaling factor has been
correctly set.
12. Pack Polarity check box in toolkit and move to next job.
Network Connection (Security Guidelines)
Allowing the Edge Device on your network
for instructions on how to set up your network for secure communications.
PLC Interface Set Up
) for instructions on how to set up the Edge to be visible on your PLC network.
12
Smart Condition Monitoring System Electrical and Communications Manual