5.
Install 80" long 1x4 trim boards on the corners of the
sidewalls using 8d galvanized nails spaced 12" apart.
:
:
42” x 72”
48” x 72”
48” x 48”
42” x 60”
48” x 36"
13” x 72”
13” x 72”
13” x 60”
Install This Row First
42” x 72”
48” x 48”
80" long 1x4
Building Tip: Install ridge vent in lieu of shingle caps. Ridge vent provides ideal ventilation,
preventing heat and moisture build-up from damaging your building or its contents.
Optional ridge vent provides
ideal ventilation.
Air
Space
Truss
Step 20B Install Roof Sheathing (continued)
Plyclip
3.
Install roof sheathing on the upper roof trusses. Insert (2) two plyclips onto roof sheathing
between every truss on the top row. The top row of roof sheathing will be about 1" below the
ridge to allow for ventilation. Use 7d coated sinker nails spaced 6" apart.
4.
Repeat for the opposite side.
After completing Step 21 next, install metal roof edging
on perimeter of the roof area. If you are not installing
shingles at this time, you can purchase felt paper to
protect the sheathing. Install the felt paper before you
install the metal roof edge.
Install shingles according to the instructions on the
wrapper. Additional information and tutorials can be
found on various online sources.
Install Roofing — Not Supplied in Kit