10
RP-HRPD-IOM (07-22) 132210-B
INSTALLATION—CONTINUED
Pre-Installation Modifications—Continued
High CFM Conversion—Continued
2 . Remove side finger baffles (see
):
a . At entering air side of heat exchanger, locate side finger baffles and remove two side finger baffle screws
from each baffle .
b . Remove both side finger baffles .
Figure 4. Side Finger Baffle Removal
3 . Install field conversion label (see
):
a . Fill in field conversion label (PN 263310) from literature bag .
b . Adhere label to unit on clean dry surface adjacent to rating plate .
4 . Test unit for proper operation ensuring that air throughput is in accordance with
.
SCREWS
SIDE FINGER BAFFLE
SCREWS
SIDE FINGER BAFFLE
Figure 5. Field Conversion Label
(date)
(name & address of company making this conversion)
263308