9
RP-HRPD-IOM (07-22) 132210-B
Table 7. High Air Throughput
RP Unit Size
Minimum
Maximum
CFM
125
1225
4605
150
1475
5530
175
1720
6450
200
1965
7370
225
2210
8295
250
2455
9215
300
2945
11,060
350
3440
12,900
400
3930
14,745
⚠ DANGER ⚠
• This conversion shall be done by a qualified service agency in accordance with the manufacturer’s
instructions and all applicable codes and requirements of the authority having jurisdiction. If the
information in these instructions is not followed exactly, a fire, an explosion, or the production
of carbon monoxide may cause property damage, personal injury, or loss of life. The qualified
service agency performing this work assumes responsibility for the conversion of this appliance
to provide for higher CFM.
• These instructions are designed to prepare the duct furnace for increased air throughput conversion
prior to installation. If your duct furnace is already installed, for your safety, turn OFF the gas and
electric supply before servicing.
NOTE: Before performing this conversion, determine if airflow is being reversed or if other field-
installed options apply. Perform desired procedure in accordance with
1 . Remove heat exchanger baffles (see
a . At discharge air side of heat exchanger, remove support bracket screws and slide entire baffle assembly out
of heat exchanger .
b . Reinstall screws to plug holes .
Figure 3. Heat Exchanger Baffle Removal
BAFFLES
SUPPORT BRACKET SCREWS