background image

STEP 1 Insert the Base Panel

  

Insert the Base Panel

Lock. 

Incorrect fit. 

Correct fit. 

When inserting the Base Panel, make sure it fits correctly between the sliding rails 
premolded in the interior of Top Cover.

When locking the Base Panel, push on the both side-locks simultaneously. Alternatively, you can push on the middle part of the 
Base Panel surrounding the Bottom Cover Lock. Do not push the Base Panel in the area of ports!

Correct setup. 

Make sure you direct antenna to the front of the StationBox Mikro.

Make sure you direct antenna to the front of the StationBox Mikro.

Insert the Base Panel to the Top Cover and push it. You should hear loud „click!“ sound.

Wrong setup.

Correct push.

Correct push.

Incorrect Push.

Quick Installation Guide

 

StationBox® Mikro

www.rfelements.com

3  How To Close the StationBox® Mikro

Make sure you connected all cables 
and opened enough premolded 
positions in the Bottom Cover to lead 
cables from the closed device. Make 
sure the Bottom Cover is sliding in the 
premolded rails.

STEP 2 Close the Bottom Cover 

Correct fit – Bottom Cover.

Slide the bottom cover to the Top 
cover. 

Bottom Cover cable positions

Correct Push.

Bottom Cover Locked.

®

Reviews: