1.
If the equipment is crated, carefully open the crate to avoid damaging the equipment.
2.
Remove the equipment from the crate and carefully examine all packing materials to make sure
no items of value are discarded.
3.
Carefully remove any packing materials that were inserted into the individual chassis to hold
circuit cards in place during transit.
3.3
MOUNTING
After unpacking, RFL 9785 equipment must be securely mounted, following the instructions in
paragraphs 3.3.1 through 3.3.3.
3.3.1
INDIVIDUAL CHASSIS
RFL 9785 terminals housed in individual chassis have two mounting ears (one on each side). Hole
sizes and spacings conform with EIA standards, so the RFL 9785 can be mounted in any standard 19-
inch rack or cabinet. Complete chassis dimensions are shown in Figure 3-1.
CAUTION
ANY INSTALLATION USING AN ENCLOSED CABINET WITH A SWING-OUT
RACK MUST BE SECURELY FASTENED TO THE FLOOR. THIS WILL PREVENT
THE CABINET FROM FALLING FORWARD WHEN THE RACK IS MOVED
OUTWARD
0.187 in. (0.475 cm.) DIA.
(4) REQ.
2.25 in. 5.25 in.
(5.715 cm.) (13.335 cm.)
1.5 in.
(3.81 cm.)
CUTOUT
17.625 in. (44.768 cm.
18.312 in. (46.512 cm)
Figure 3-1. Mounting dimensions, RFL 9785 Programmable ON/OFF Powerline Carrier System
RFL 9785
RFL Electronics Inc.
May 16, 2011
3-2
(973) 334-3100