Framing End Walls
1.
Make sure your greenhouse is plumb.
2.
Read all of the instructions for your doors and equipment first to double
check rough openings and assembly process.
3.
Using the grids on the following pages, sketch out where your doors and
equipment will be located. See rough openings for all doors and equipment
and make not of the dimensions.
4.
See examples of layouts for doors and equipment. If you need further
assistance on the layout, please contact your salesman for more specific
information.
5.
You will need 6 verticals per end wall. Verticals should be set into concrete
for stability. One bag of concrete is sufficient as a footing.
6.
Horizontals should have a maximum spacing distance of 4 ft. apart.
7.
See photos of how wood framing and metal framing is constructed
8.
Read through these entire directions to see illustrations and photos
Summary of Contents for Nor' Easter 20-11
Page 1: ...Nor Easter Greenhouse Installation Directions 603 629 9004 for Customer Support Version 20 11 ...
Page 3: ...Illustrated Parts List ...
Page 4: ......
Page 14: ...This is a fence post driver This is a gas powered post driver ...
Page 17: ......
Page 18: ...Ridge Connector Bow ...
Page 27: ......
Page 29: ......
Page 37: ...37 ...
Page 38: ...38 ...
Page 39: ...39 This shows how you can use an angle bracket to also connect framing lumber to the bows ...
Page 40: ...40 ...
Page 41: ...41 ...
Page 42: ...42 Examples of framing and installation of a roll up door in the next series of photos ...
Page 43: ...43 ...
Page 44: ...44 ...
Page 45: ...45 ...
Page 46: ...46 ...
Page 47: ...47 Examples of other framing ...
Page 48: ...48 ...
Page 50: ...50 ...