80
Twinning operation of two furnaces, installed side-by-side,
connected by a common duct system with main power
supplied by the same source, and controlled by a common
thermostat can be done with the UT Electronic Controls
1194-200 integrated control boards.
IMPORTANT:
Only twin furnaces with identical control boards.
IMPORTANT:
Only bottom returns can be used. No more than
two furnaces can share the same supply and return. Furnaces
must have same heating and blower capacity. Twinning furnaces
must operate off the same phase of power.
It should be noted that both blowers will run simultaneously when
there is a call for heating, cooling or fan.
NOTE:
Duct system must be adequate to provide correct airflow
to each furnace for supply and return.
UT ELECTRONIC CONTROLS 1194-
200 CONTROL BOARD
(62-104058-02)
1. Single Stage Operation
a. Control board “ONE” is on furnace connected to the
thermostat.
b. The 24 VAC supply to both control boards must be
in phase with each other.
c. Connect the “C,” “W” and “TWIN” terminals to coun-
terparts on each control.
d. Twinning is automatically detected when wire is con-
nected to the twin terminal on both controls. If twin-
ning is detected and then lost in the same power
cycle, the furnace control will declare and display
fault code 20 at the seven-segment display.
See Figure 44 for twinning wire diagram for 1-stage ther-
mostat.
See Figure 45 for twinning wire diagram for 2-stage ther-
mostat.
TWINNING
FURNACE TWINNING INSTALLATIONS
Twinning
Summary of Contents for 95MSP series
Page 34: ...34 Field Conversions ...
Page 35: ...35 Field Conversions ...
Page 36: ...36 Field Conversions ...
Page 37: ...37 Field Conversions ...
Page 38: ...Field Conversions 38 ...
Page 99: ...99 ...
Page 100: ...100 CM 0716 ...