31
Figure 19
DOUBLE TANK SYSTEM SCHEMATIC
with Tankless Back up
Note:
When two collectors are
required, plumb in parallel.
Pipe Insulation
Collector Return
Cold Water Supply
Inlet
Feed
1
2
4
Hot Water Supply
Outlet to Fixtures
9
12
13
14
15
16
17
19
21
22
24
22
26
27
Roof Jacks
Tankless Back-up
25
20
10
11
7
5
6
18
3
26
DOUBLE TANK SYSTEM
SCHEMATIC with
TANKLESS BACKUP*
Figure 19
* Installation as shown does not reflect SRCC approval or certification.