Note
: The Vent illustration in Figures 1 & 2 can be used for Non-direct furnace vent termination also.
NOTE:
Install the vent and air intake piping into the vent plate openings. Seal all gaps between the pipes and wall.
Be Sure to Use Silicone Sealant
to seal the vent pipe to the vent cap to permit field disassembly for annual inspection and cleaning.
Also seal all pipe penetrations in wall. To prevent possibility of condensate freeze-up or recirculation,
do not install vent kits one
above the other.
Note:
Vent should protrude a maximum of 2-1/4” beyond
vent plate. Air intake should protrude a maximum
of 1 inch beyond vent plate. Use the vent plate as a
template to locate vent, combustion air and (4)
mounting holes. Observe minimum clearances.
Cut (2) 3-7/8” diameter holes for the vent and
combustion air openings.
Drill (4) 3/16” diameter holes for inserting the
plastic anchors into the wall.
Attach the vent plate to the wall with (4) - 2” long
stainless steel screws.
Assemble the vent cap to the vent plate . Insert the
(4) 1” long stainless steel screws into the vent cap screw
hole openings and securley attach the vent cap to the
vent plate. Seal all wall cavities.
FIGURE 1
VENT KIT INSTALLATION OPTIONS
92-102005-02-00
INSTALLATION
–
RXGY- G01 Side Wall Vent
This termination is for horizontal venting only.
Important:
Avoid installingon the prevailing winter wind side of the structure
Note:
Multi-venting-No common venting. Refer to furnace I & O for instructions.
ST-A1075-03-00
Refer to Installation Instructions for clearances.
12” MINIMUM TO OVERHANG
VENT
COMBUSTION AIR
FIGURE 2
TYPICAL INSTALLATION
3 “ Pipe