background image

 

Assembly  Instructions 

5x10x8 CycleCabana

TM 

 

 

 

ITEM # 

 

#1 

 

#2 

 

#3 

 

#4 

 

#5 

 

#6 

 

#7 

 

#8 

 

#9 

 

#10 

 

#11 

 

#12 

 

#13 

 

#14 

 

#15 

 

#16 

 

#17 

 

#18 

 

#19 

 

#20 

#21 

#22 

#23 

#24 

 
 

V1.0 

 
 
 
 

PART # 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CBN-3005-3 

 

CBN-3005-2 

 
 
 

CBN-3005-W 

 

CBN-3005-W 

 
 
 

EP-1001 

 

EP-1000 

 
 
 
 
 

UB-3002 

 

DBA-3000 

DR-3001 

TB-3004 

 
 
 

DESCRIPTION 

 

BENT SIDE CREST TUBE 

 

TOP CREST TUBE 

 

END ARCH UPRIGHT WITH FOOT 

 

CENTER STRAIGHT UPRIGHTS 

 

CROSS RAIL A 

 

CROSS RAIL B 

 

CONNER WIND BRACE A 

 

CONNER WIND BRACE B 

 

3/8"X3-1/4"  CARRIAGE BOLT 

 

3/8"X2-1/8"  CARRIAGE BOLT 

 

3/8"X1-5/8"  CARRIAGE BOLT 

 

3/8"  CURVE WASHER 

 

3/8"  WASHER 

 

3/8" LOCKNUT 

 

1” END PLUG 

 

1 5/8” END PLUG 

 

BUNGEE CORD HOLD UPS 

 

ROPE 

 

U BOLTS WITH NUTS 

 

EARTH CABLE ANCHORS 

36" DRIVE ROD 

TURNBUCKLES 

MAIN COVER 

DOORS 

 
 
 

QUANTITY 

 

 

 

 

 

 

 

 

 

15 

 

 

 

19 

 

 

23 

 

10 

 

 

 

 

 

 

2  

Do NOT Return Assembly To Dealer or Store. For All Questions or Shortages Please Call MDM Products Directly  
 

Customer Service 800-447-7079 or 203-877-7070  

Summary of Contents for CycleCabana

Page 1: ...the product described herein 105 Woodmont Road Milford CT 06460 Visit our Web Site at www mdmshelters com Copyright 2009 by MDM Products All rights reserved No portion of this manual or any artwork co...

Page 2: ...from carrier and any evident damages should be noted on the bill of lading before signing If upon opening the cartons V1 0 hidden damage is noted contact carrier or its agent immediately Claims for s...

Page 3: ...AIL A CROSS RAIL B CONNER WIND BRACE A CONNER WIND BRACE B 3 8 X3 1 4 CARRIAGE BOLT 3 8 X2 1 8 CARRIAGE BOLT 3 8 X1 5 8 CARRIAGE BOLT 3 8 CURVE WASHER 3 8 WASHER 3 8 LOCKNUT 1 END PLUG 1 5 8 END PLUG...

Page 4: ...debris however large branches or other falling items may cause puncture or tears in the cover material Take notice of drainage around your intended location Water draining from the surrounding terrain...

Page 5: ...ing two interior arches using 1 Top Crest Tube 2 2 Bent Tube Side Crest 1 and 2 Center Straight Upright Part 4 for each of the arches Use CBN 3000 2 carriage bolts 10 with washers and nuts in the pre...

Page 6: ...ion where you are placing the building has very hard ground or any rock in it pre drill the holes before inserting anchors Hammer drills can be rented at most home improvement or rent all centers Hitt...

Page 7: ...h before installing door ends Remove Carriage bolts from the Top Crest Rail and the two Upper Cross Rails Install End Panel Doors w Zippers P art 24 on ends of the Frame assembly Place the end panel o...

Page 8: ...ure downward with a foot to remove excess Re adjust gathered material evenly along door rope This step is key to getting a good door fit Tie off the end off the rope to a second turnbuckle attached to...

Page 9: ...ght that it tears the material cover The fabric backed PE fabric of Rhino Shelter units does not stretch If you pull it so tight that the fabric is stretched a small amount of additional stress from w...

Page 10: ...ontact can cause premature tears and material failure Only tighten cover enough to remove valleys between arch assemblies Do Not over tighten Ret ighten the turnbuckles on both the cover a nd end p an...

Page 11: ...ompletely extended nor taken up so that turnbuckle should be tight when in the mid range of overall adjustment If necessary readjust rope tie off on turnbuckle as needed to tighten or loosen as needed...

Reviews: